SpecialiSt eXaM StUDy gUiDe
2026/2027 cOMplete QUeStiOnS witH
veRiFieD cORRect anSweRS ||
100% gUaRanteeD paSS
<neweSt veRSiOn>
1. T or F In the native viewer you can expand the email header to display full
email addresses? - ANSWER ✔ True
2. What are the redact markup visibility options? - ANSWER ✔ Full visibility,
transparent, hidden, and solid.
3. What search functionality is available in the native document viewer? -
ANSWER ✔ dtSearch is supported, so proximity, fuzziness, and stemming
can be used.
4. T or F Image rotation in the Image Viewer is persistent. - ANSWER ✔ True
- pages rotated will be rotated the next time you return to them and when
produced.
5. What are the markup visibility options? - ANSWER ✔ Full visibility,
transparent, hidden.
,6. What are the redaction modes? - ANSWER ✔ Basic, Full page, Inverse,
Mass
7. What are the options on the Document actions menu? - ANSWER ✔
Download document native
Copy document link
Email document link
Image on the fly/Delete all Images for this document
8. What are the options on the Viewer settings menu? - ANSWER ✔ Keyboard
Shortcut Legend
Disable Keyboard Shortcuts
Show Tab Strip
Pop Out Viewer
Swap Layout
9. What is the fastest way to determine which reviewer drew a specific
redaction, when they redacted, and in which Markup Set they saved that
redaction?
a. Review the Markup Set Navigator in order to to figure out who drew a
specific redaction for a particular Markup Set.
b. Review the Document History to figure out who drew a specific
redaction for a particular Markup Set.
c. Review the Production History to figure out who drew a specific
redaction for a particular Markup Set.
d. Right-Click the specific redaction to review the Markup Set History to
figure out who drew a specific redaction for a particular Markup Set. -
ANSWER ✔ d. Right-Click the specific redaction to review the
, Markup Set History to figure out who drew a specific redaction for a
particular Markup Set.
10.What annotation is displayed for every type of document supported by
Document Intelligence?
a. Tracked Changes
b. Speaker Notes
c. Formulas
d. Comments - ANSWER ✔ d. Comments
11.You are configuring a layout, and add a field named issues with six choices.
You'd like the choices in three columns, with two choices in each column.
How can you configure this layout?
a. Create a new Category on the layout and put the field in that Category
by itself.
b. Set the Repeat Columns setting on the layout to 3.
c. Set "show field name" to "No" and set the "Rows" option to 3.
d. Use the Custom Label section and set it to 3. - ANSWER ✔ b. Set the
Repeat Columns setting on the layout to 3.
12.How does an admin pause a Prioritised Review? - ANSWER ✔ By clicking
the Pause Prioritised Review button n the queue modal. You can restart the
review at any time. Documents coded on the review field while the review is
paused are included when the model is next rebuilt.
13.What steps do you take if you want to add or remove documents fro your
Active Learning project after review has begun? - ANSWER ✔ 1. Click
Pause Review to stop the review queue.
, 2. Add or remove documents to the saved search used as the data source for
the classification index. Be sure to return only the extracted text in your
saved search.
3. Navigate to the Analytics indexes tab, and then click the classification
index used to create your Active Learning project.
4. On the index console, click Run, then Incremental.
5. Once the index finishes populating, return to your review queue and click
Start Review.
14.In Prioritised Review, if one of the documents is a family member of a
document which has previously been reviewed, will the other reviewed
family members be served up for review again? - ANSWER ✔ No.
15.In Prioritised Review, if you turn off index health documents, what will the
percentage now be of highly-ranked documents in the review queue? -
ANSWER ✔ 100&, up from 70%.
16.In Prioritised Review, how do you turn off index health documents? -
ANSWER ✔ To turn index health documents off, navigate to the Project
Home tab and do the following:
1. Click the Project Settings gear icon in the top-right corner.
2. Click the edit icon next to the header.