Instructor’s Manual and Test
bank
Constructive Guidance and Discipline: Birth to Age Eight 7th Edition
by Marjorie Fields, Patricia Meritt
LU
XE
LI
BR
AR
Y
, TABLE OF CONTENT
1. The Project Delivery System
2. Responsibility and Authority
3. Resident Project Representative Office Responsibilities
4. Documentation: Records and Reports
5. Electronic Project Administration
6. Specifications and Drawings
7. Using the Specifications in Contract Administration
LU
8. Construction Laws and Labor Relations
9. Construction Safety
10. Meetings and Negotiations
11. Risk Allocation and Liability Sharing
XE
12. Preconstruction Operations
13. Planning for Construction
14. CMP Scheduling for Construction
15. Construction Operations
LI
16. Value Engineering
17. Measurement and Payment
BR
18. Construction Materials and Workmanship
19. Changes and Extra Work
20. Claims and Disputes
21. Project Closeout
AR
Y
, LKJHGFDSA
INTRODUCTION
This study guide has been prepared as a supplement to each instructor's own lesson plan and
evaluation questions. The end of chapter questions are answered in this study guide.
A copy of a mid-term and a final examination is also included for the instructor’s reference.
LU
XE
LI
BR
AR
Y
2
, LKJHGFDSA
PART I
ANSWERS TO TEXTBOOK
LU
QUESTIONS
XE
LI
BR
AR
Y
3
bank
Constructive Guidance and Discipline: Birth to Age Eight 7th Edition
by Marjorie Fields, Patricia Meritt
LU
XE
LI
BR
AR
Y
, TABLE OF CONTENT
1. The Project Delivery System
2. Responsibility and Authority
3. Resident Project Representative Office Responsibilities
4. Documentation: Records and Reports
5. Electronic Project Administration
6. Specifications and Drawings
7. Using the Specifications in Contract Administration
LU
8. Construction Laws and Labor Relations
9. Construction Safety
10. Meetings and Negotiations
11. Risk Allocation and Liability Sharing
XE
12. Preconstruction Operations
13. Planning for Construction
14. CMP Scheduling for Construction
15. Construction Operations
LI
16. Value Engineering
17. Measurement and Payment
BR
18. Construction Materials and Workmanship
19. Changes and Extra Work
20. Claims and Disputes
21. Project Closeout
AR
Y
, LKJHGFDSA
INTRODUCTION
This study guide has been prepared as a supplement to each instructor's own lesson plan and
evaluation questions. The end of chapter questions are answered in this study guide.
A copy of a mid-term and a final examination is also included for the instructor’s reference.
LU
XE
LI
BR
AR
Y
2
, LKJHGFDSA
PART I
ANSWERS TO TEXTBOOK
LU
QUESTIONS
XE
LI
BR
AR
Y
3