Entry-Level Study Guide with 200+ Practice Questions, Detailed
Explanations, 30–99 HP Operation, Boiler Safety Fundamentals,
COMAR 09.17, and PSI Exam Tips – Start Your Stationary
Engineering Career
1. What is the maximum horsepower (HP) a Grade 4 stationary engineer is authorized to
operate in Maryland?
A) 15 – 29 HP
B) 30 – 99 HP
C) 100 – 299 HP
D) 300 – 499 HP
Explanation: A Grade 4 license authorizes operation of boilers and equipment in the range
of 30 to 99 horsepower. Grade 3 is required for 100 HP and above.
2. What is the minimum experience required to qualify for the Grade 4 examination via the
progressive pathway?
A) No experience required
B) 6 months as a Grade 5 engineer
C) 1 year as a Grade 5 engineer
D) 2 years as a Grade 5 engineer
Explanation: The standard progressive pathway requires 6 months of documented
experience as a Grade 5 stationary engineer.
3. What alternative qualification can be used instead of 6 months of Grade 5 experience?
A) High school diploma
B) 3 credit hours or CEUs in boiler operations
C) Valid driver's license
D) First aid certification
Explanation: Completion of 3 credit hours or continuing education units (CEUs) in
boiler safety or operations qualifies for the Grade 4 examination.
, 4. What is the first thing you should check before starting a boiler?
A) Fuel pressure
B) Water level in the gauge glass
C) Steam pressure
D) Stack temperature
Explanation: Before any startup, the operator must confirm that the boiler has a safe water
level to prevent overheating and tube damage.
5. What is the purpose of a low-water fuel cutoff?
A) Reduce fuel pressure
B) Shut off fuel supply when water level drops below safe limits
C) Increase feedwater flow
D) Control steam pressure
Explanation: A low-water fuel cutoff is a critical safety device that interrupts the fuel supply
if water level falls to a dangerous point.
6. What is the function of a safety valve on a boiler?
A) Control steam temperature
B) Relieve pressure if maximum allowable working pressure is exceeded
C) Regulate fuel flow
D) Monitor water chemistry
Explanation: The safety valve automatically opens at the set pressure to prevent
overpressure and potential explosion.
7. How often should gauge glasses be blown down?
A) Weekly
B) At least once per shift or daily
C) Monthly
D) Annually
Explanation: Blowing down gauge glasses daily confirms that water passages are clear
and the water level indication is accurate.
8. What is the purpose of a try lever on a safety valve?
, A) Adjust pressure setting
B) Manually test the valve operation
C) Lock the valve closed
D) Increase valve capacity
Explanation: The try lever allows manual testing of the safety valve to ensure it is not stuck
and will open freely when required.
9. What does a gauge glass indicate?
A) Steam pressure
B) Water level in the boiler
C) Fuel flow
D) Flue gas temperature
Explanation: The gauge glass provides a direct visual indication of the water level,
essential for safe boiler operation.
10. What is the purpose of a steam pressure gauge?
A) Measure water level
B) Measure steam pressure inside the boiler
C) Measure fuel flow
D) Measure stack temperature
Explanation: The pressure gauge indicates the operating pressure of the boiler.
11. What is the minimum required purging time for a boiler before ignition?
A) No purge required
B) Sufficient time to complete multiple air changes (typically 5–10)
C) 10 seconds
D) 30 seconds
Explanation: Proper purging removes combustible gases from the furnace. Follow
manufacturer specifications for purge timing.
12. What is the purpose of a steam trap?
A) Trap steam in the system
B) Remove condensate and non-condensable gases while retaining steam