Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 77 pages
Exam (elaborations)

IEC 2A Exam Questions and Answers With Verified Solutions 2026. Exam Questions and Correct Answers With 100% Correct Answers | Latest 2026 |

Document preview thumbnail
Preview 4 out of 77 pages

IEC 2A Exam Questions and Answers With Verified Solutions 2026. Exam Questions and Correct Answers With 100% Correct Answers | Latest 2026 |

Content preview

IEC 2A Exam Questions and Answers With Verified Solutions 2025


The primary purpose of grounding metal equipment enclosures and metal raceways to the grounding
electrode system (earth) is to ___.

I. cause the quick operation of OCPDs

II.keep all metal parts at the same voltage

III. limit voltage surges - ✔✔e. II & III only



A metal enclosure surrounding electrically operated equipment ___.

a. is required to be grounded

b. protects the equipment from physical damage

c. provides protection for people against accidental contact with live parts - ✔✔d. all of these



The amount of current that flows in any circuit is determined by the voltage and resistance of the circuit.

Select one:

a. True

b. False - ✔✔a. True



___ is defined as case or housing of apparatus, or the fence or walls surrounding an installation to
prevent personnel from accidentally contacting energized parts or to protect the equipment from
physical damage.

Select one:

a. Inaccessible

b. Guarded

c. Isolated

d. Enclosure - ✔✔: Enclosure



The circuit installed in a run of PVC conduit requires a 6 AWG equipment grounding conductor.
However, a 12 AWG was installed instead. Using the 12 instead of the 6 AWG wire will ___ the amount
of time required for a circuit breaker to open when a ground fault occurs.

,Select one:

a. increase

b. decrease

c. have no effect on - ✔✔increase



Providing a low impedance ground return path ___ when a ground-fault occurs.

Select one:

a. has no effect on the circuit current

b. permits a high current to flow

c. limits the amount of current to a small amount - ✔✔permits a high current to flow



In a run of conduit, when couplings and connectors are loose this will ___ the amount of time required
for a circuit breaker to open when a short-circuit occurs.

Select one:

a. have no effect on

b. increase

c. decrease - ✔✔have no effect on



The plans indicate that you should install a 300-amp branch circuit in Schedule 40 PVC with a 4 AWG
equipment grounding conductor. However, you did not have any 4 AWG wire so you pulled in 10 AWG
instead. With a load connected, the normal circuit current will be ___ with the 10 AWG EGC (compared
to using a 4 AWG EGC).

Select one:

a. the same

b. less

c. greater - ✔✔the same



The primary purpose of grounding metal equipment enclosures and metal raceways to the grounding
electrode system (earth) is to ___.I. cause the quick operation of OCPDsII. keep all metal parts at the
same voltageIII. limit voltage surges

Select one:

,a. I only

b. I, II & III

c. I & III only

d. I & II only

e. II & III only - ✔✔II & III only



A metal enclosure surrounding electrically operated equipment ___.

Select one:

a. is required to be grounded

b. protects the equipment from physical damage

c. provides protection for people against accidental contact with live parts

d. all of these - ✔✔all of these



Refer to Figure 205.15. The flex used between the breaker enclosure and the motor contains three 350
kcmil conductors. The minimum size of the EGC between the 700-A breaker and the motor is ___.

Select one:

a. 350 kcmil

b. 3/0 AWG

c. 2 AWG

d. 1/0 AWG

e. none of these - ✔✔1/0 AWG



Three 4/0 AWG conductors are installed in the flex between the breaker enclosure, containing a 500-A
breaker, and the motor. The smallest EGC that can be installed in the flex shown in Figure 205.15 is ___.

Select one:

a. 2/0 AWG

b. 4/0 AWG

c. 1 AWG

d. 3 AWG

e. none of these - ✔✔none of these

, The plans indicate that you should install a 200-Amp branch circuit in Schedule 40 PVC with a 6 AWG
equipment grounding conductor. However you did not have any 6 AWG wire so you pulled in 12 AWG
instead. Compared to the correct circuit (with the 6 AWG EGC) your circuit will take ___ time for the
circuit breaker to open when a ground fault occurs.

Select one:

a. the same amount of

b. less

c. more - ✔✔: more



Refer to Figure 205.11. The 200-A safety switch contains 125-amp fuses. The raceways used between
the switch and the 3Ø motor contain three 2 AWG conductors. The minimum size of the EGC between
the safety switch and the motor is ___ AWG.

Select one:

a. 4

b. 6

c. 8

d. 2

e. 3 - ✔✔6



Refer to Figure 205.14. Load 1 is supplied from a 100 A circuit breaker with 3 AWG conductors. Load 2 is
supplied from a 350-Amp breaker with 500 kcmil conductors. Both loads are 3-ph, 3-wire. The smallest
grounding conductor that can be installed between the pull box and Load 1 is ___ AWG.

Select one:

a. 6

b. 2

c. 4

d. 8

e. 3 - ✔✔8



Refer to Figure 205.14. Load 1 is supplied from a 150-A circuit breaker with 1 AWG conductors. Load 2 is
supplied from a 300-Amp breaker with 4/0 AWG conductors. Both loads are 3-ph, 3-wire. Where only

Document information

Uploaded on
March 18, 2026
Number of pages
77
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECTpharis
4.8
(8)
Sold
41
Followers
1
Items
6040
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions