Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 112 pages
Exam (elaborations)

IEC Year 2 Exam Questions and Answers With Verified Solutions 2026. Exam Questions and Correct Answers With 100% Correct Answers | Latest 2026 |

Document preview thumbnail
Preview 4 out of 112 pages

IEC Year 2 Exam Questions and Answers With Verified Solutions 2026. Exam Questions and Correct Answers With 100% Correct Answers | Latest 2026 |

Content preview

IEC Year 2 Exam Questions and Answers With Verified Solutions 2025


The large-scale adoption of the business computer led to a new form of drafting called ___.

Select one:

a.Building Information Modeling (BIM)

b.Computer-Aided Drafting (CAD)

c.BlueBeam

d.DesignCAD - ✔✔b.

Computer-Aided Drafting (CAD)



Prints are drawn to a scale. Electricians use a(n) ___ scale when reading and determining measurements
on a print.

Select one:

a.architectural

b.digital

c.engineering

d.ratio - ✔✔



Which MasterFormat® Division is used for electrical specifications?

Select one:

a.Division 26

b.Division 01

c.Division 14

d.Division 44 - ✔✔a.

Division 26



RFP is the acronym for ___.

Select one:

a.Request for Proposal

,b.Request for Personnel

c.Request for Products

d.Request for Pricing - ✔✔d.

Request for Pricing



Which schedule is the most important for the electrician?

Select one:

a.the finish schedule

b.the panel schedule

c.the fixture schedule

d.the power schedule - ✔✔b.

the panel schedule



The ___ plan shows location of lighting fixtures and other equipment, such as air-handling diffusers,
smoke detectors, or sprinkler heads.

Select one:

a.lighting

b.power

c.one-line / riser diagram

d.reflected ceiling plan - ✔✔



The ___ is an isometric view of the distribution system to install from.

Select one:

a.power plan

b.structural plan

c.one-line / riser diagram

d.general plan - ✔✔c.

one-line / riser diagram

,It is also important to read the ___ plan to determine where an electrical installation may be required,
such as how close to install a receptacle near a sink.

Select one:

a.structural

b.general

c.lighting

d.mechanical and plumbing - ✔✔



___ are commonly shown on all drawings to provide basic information such as general references, tasks
to be performed, or code conformity.

Select one:

a.General Notes

b.Key Notes

c.Special Notes

d.Information Notes - ✔✔a.

General Notes



The ___ plan shows the compass direction of the building.

Select one:

a.floor

b.elevation

c.compass

d.plot - ✔✔d.

plot



The project delivery method where the owner works with the architect/engineers directly at project
start is ___.

Select one:

a.design-bid/build

b.design-build

, c.time and material

d.build-design - ✔✔a.

design-bid/build



The project delivery method where the GC is responsible for much of the design is ___.

Select one:

a.design-bid/build

b.design-build

c.time and material

d.build-design - ✔✔



The project delivery method used for change orders or small projects is ___.

Select one:

a.design-bid/build

b.design-build

c.time and material

d.build-design - ✔✔



RFP typically means ___.

Select one:

a.reinforced partition

b.rounded furniture post

c.request from plumber

d.request for pricing/proposal - ✔✔d.

request for pricing/proposal



Costs for additional items not covered in the original construction contract are authorized by ___.

Select one:

a.change orders

Document information

Uploaded on
March 18, 2026
Number of pages
112
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECTpharis
4.8
(8)
Sold
41
Followers
1
Items
6040
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions