Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

IEC First Year Exam Questions and Answers With Verified Solutions 2026. Exam Questions and Correct Answers With 100% Correct Answers | Latest 2026 |

Document preview thumbnail
Preview 2 out of 6 pages

IEC First Year Exam Questions and Answers With Verified Solutions 2026. Exam Questions and Correct Answers With 100% Correct Answers | Latest 2026 |

Content preview

IEC First Year Exam Questions and Answers With Verified Solutions 2025


What is the result if the neutral wire becomes open on a multiwire circuit having unequal loads? -
✔✔The load of higher resistance would overheat and probably be damaged.



The Code reference that specifies the type of disconnecting means (circuit breaker for example) that can
be used on a multiwire branch circuit that feeds devices mounted on the same yoke [a stack switch or a
duplex receptacle for example] is ___. - ✔✔240.15(B)(1)



Refer to the panel schedule shown in Figure 128.231. If the neutral is removed from the neutral bar, ___
volts will be applied to the TV. - ✔✔150



A 12/3 cable is installed from a 120/240-V, 1Ø panel and feeds a split-wired duplex receptacle. One
"hot" is connected to a 20A breaker in panel space 1. The second "hot" is connected to a 20A breaker in
space 3. A 16-amp load is connected to the upper receptacle and a 14-amp load is connected to the
lower receptacle. Which of the following will happen if the neutral is removed from the receptacle? -
✔✔Because a higher voltage will be applied, 120-volt equipment could be destroyed.



Refer to Figure 129.106. With the equipment energized and the power used by the element connected
at T3 & T4 is 0.3kW, the power used by the equipment (all 4 elements) ___. - ✔✔is 1.2 kW



- ✔✔



A short length of EMT is run between two panels. The ampacity values for the conductors in this EMT
need not be derated, as long as the length of the EMT does not exceed ___. - ✔✔24 in.



An extension ladder should extend ___ feet above the top of the building and be secured. - ✔✔3ft.



What is the monthly energy cost to operate a 250-watt high-pressure sodium lamp? Electricity costs
$0.15 per kW-hr and the lamp will be ON for 8 hours per day. There are 30 days in a billing month. -
✔✔$9.00

, ___ can be described as the point of demarcation between where the serving utility ends and the
premises wiring begins. - ✔✔Service Point



If a 60-watt lamp operates for 21 hours, the utility will bill for ___ kWh. - ✔✔1.260



To minimize conductor insulation damage and arcing damage to electrical equipment during a ground
fault or a short circuit, ___ should be minimized. - ✔✔a. time duration of the fault



Article ___ in the NEC ® covers grounding and bonding of electrical systems. - ✔✔250



Self-tapping sheet metal screws (TEK screws) ___ permitted to be used to connect the equipment
grounding conductor to a metal box. - ✔✔are not



For a 100-Amp, 120/240-V, 3W commercial service, ___ AWG copper THHN/THWN conductors are the
smallest permitted for the ungrounded conductors. - ✔✔3



Loads, such as heating and air conditioning, that do not operate at the same time are said to be
noncoincident loads. While separate circuits must be designed to serve each load, when calculating
service load only the ___ of two noncoincident loads needs to be included. - ✔✔larger



Which of the following is a 3/0 AWG conductor? - ✔✔000



When calculating the size of the required service, you should consult household electric clothes dryer
demand factors given in Table ___. - ✔✔220.54



The Standard for Electrical Safety in the Workplace requires that all electrical equipment operating at
over ___ volts to ground be de-energized and locked out before anyone is permitted to work on or near
the equipment. - ✔✔50



Without exceptions, all metal parts of an indoor spa or hot tub must be bonded. - ✔✔true



Article ___ of the NEC ® is the article that gives requirements for swimming pool installations. - ✔✔680

Document information

Uploaded on
March 18, 2026
Number of pages
6
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LECTpharis
4.8
(8)
Sold
41
Followers
1
Items
6040
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions