A speed sensitive governor may be:
M M M M M
1. Proportional.
2. Mechanical.
3. Mechanical-hydraulic.
4. Electronic-hydraulic.
a. 1,2
b. 3,4
c. 1,2,3
d. 2,3,4
e. 1,2,3,4. -correct-answer-D
M
In a mechanical-hydraulic governor system, what is the purpose of the auxiliary oil
M M M M M M M M M M M M
Mpump?
a. It provides oil pressure in case of a main pump failure.
M M M M M M M M M M
b. It provides oil pressure to the bearings.
M M M M M M
c. It provides oil pressure to the governor system.
M M M M M M M
d. It provides oil pressure during start-up of the turbine.
M M M M M M M M
e. It boosts the main pump's pressure. -correct-answer-D
M M M M M M
,2|Page
An electronic-hydraulic governor system uses:
M M M M
a. High pressure oil from the turbine oil system.
M M M M M M M
b. A separate fluid power unit for high pressure oil.
M M M M M M M M
c. Oil pressure of approximately 3000-4000 kPa.
M M M M M
d. Pressure oil from the turbine oil system and boosts it to
M M M M M M M M M M
approximately 8200-11000 kPa.
M M M
e. Flyweights similar to a mechanical-hydraulic governor. -correct-answer-B
M M M M M M
A mechanical overspeed trip is designed to
M M M M M M M in the event of an overspeed
M M M M M
condition.
M
a. Prevent the turbine's speed from exceeding 150% of its rated speed.
M M M M M M M M M M
b. Activate an alarm. M M
c. Drop the turbine's load. M M M
d. Shut off the turbine's steam supply.
M M M M M
e. Throttle the inlet steam. -correct-answer-D
M M M M
When starting a large condensing or extraction turbine, the lubricating oil pump is
M M M M M M M M M M M M
usually started:
M M
a. Just before the turbine is rotated.
M M M M M
b. One half hour before the turbine is rotated.
M M M M M M M
,3|Page
c. 2-3 hours before the turbine is rotated.
M M M M M M
d. 6-8 hours before the turbine is rotated.
M M M M M M
e. The pump is left running at all times. -correct-answer-C
M M M M M M M M
The extraction (condensate) pump is put into operation
M M M M M M M M the M .
1. Before.
2. After . M
3. Air ejector. M
4. Jack oil pump. M M
5. Condenser circulating water pump. M M M
a. 1, 3 M
b. 2, 3 M
c. 1, 4
M
d. 1, 5 M
e. 2, 5. -correct-answer-A
M M
When starting a turbine, a speed of 200-300 rpm is maintained for what purpose?
M M M M M M M M M M M M M
a. To allow the barring gear time to disengage.
M M M M M M M
b. To allow the operator time to listen for rubbing or other
M M M M M M M M M M
unusual noises.
M M
c. To ensure all controls are functioning.
M M M M M
, 4|Page
d. To warm up the rotor and casing.
M M M M M M
e. To ensure the lube oil system is operating correctly. -correct-answer-D
M M M M M M M M M
The warm-up time required of a turbine is dependant on:
M M M M M M M M M
a. How quickly the turbine is required.
M M M M M
b. The manufacturer's instructions.
M M
c. The size of the turbine.
M M M M
d. The type of turbine.
M M M
e. Whether the steam is dry or wet. -correct-answer-C
M M M M M M M
When shutting down a turbine, the first thing done is:
M M M M M M M M M
a. Turn off the lube oil cooling water.
M M M M M M
b. Test the emergency trip.
M M M
c. Start the auxiliary oil pump.
M M M M
d. Shut off the steam supply.
M M M M
e. Reduce the load to zero. -correct-answer-E
M M M M M
Sealing steam to the turbine glands is admitted
M M M M M M M M is put in operation
M M M
a. Before the extraction pump.
M M M
b. Before the condenser circulating water pump.
M M M M M
3B2 - Ultimate ABSA Study Guide C1-15 |
Comprehensive Q&A For Certification
Success
A speed sensitive governor may be:
M M M M M
1. Proportional.
2. Mechanical.
3. Mechanical-hydraulic.
4. Electronic-hydraulic.
a. 1,2
b. 3,4
c. 1,2,3
d. 2,3,4
e. 1,2,3,4. -correct-answer-D
M
In a mechanical-hydraulic governor system, what is the purpose of the auxiliary oil
M M M M M M M M M M M M
Mpump?
a. It provides oil pressure in case of a main pump failure.
M M M M M M M M M M
b. It provides oil pressure to the bearings.
M M M M M M
c. It provides oil pressure to the governor system.
M M M M M M M
d. It provides oil pressure during start-up of the turbine.
M M M M M M M M
e. It boosts the main pump's pressure. -correct-answer-D
M M M M M M
,2|Page
An electronic-hydraulic governor system uses:
M M M M
a. High pressure oil from the turbine oil system.
M M M M M M M
b. A separate fluid power unit for high pressure oil.
M M M M M M M M
c. Oil pressure of approximately 3000-4000 kPa.
M M M M M
d. Pressure oil from the turbine oil system and boosts it to
M M M M M M M M M M
approximately 8200-11000 kPa.
M M M
e. Flyweights similar to a mechanical-hydraulic governor. -correct-answer-B
M M M M M M
A mechanical overspeed trip is designed to
M M M M M M M in the event of an overspeed
M M M M M
condition.
M
a. Prevent the turbine's speed from exceeding 150% of its rated speed.
M M M M M M M M M M
b. Activate an alarm. M M
c. Drop the turbine's load. M M M
d. Shut off the turbine's steam supply.
M M M M M
e. Throttle the inlet steam. -correct-answer-D
M M M M
When starting a large condensing or extraction turbine, the lubricating oil pump is
M M M M M M M M M M M M
usually started:
M M
a. Just before the turbine is rotated.
M M M M M
b. One half hour before the turbine is rotated.
M M M M M M M
,3|Page
c. 2-3 hours before the turbine is rotated.
M M M M M M
d. 6-8 hours before the turbine is rotated.
M M M M M M
e. The pump is left running at all times. -correct-answer-C
M M M M M M M M
The extraction (condensate) pump is put into operation
M M M M M M M M the M .
1. Before.
2. After . M
3. Air ejector. M
4. Jack oil pump. M M
5. Condenser circulating water pump. M M M
a. 1, 3 M
b. 2, 3 M
c. 1, 4
M
d. 1, 5 M
e. 2, 5. -correct-answer-A
M M
When starting a turbine, a speed of 200-300 rpm is maintained for what purpose?
M M M M M M M M M M M M M
a. To allow the barring gear time to disengage.
M M M M M M M
b. To allow the operator time to listen for rubbing or other
M M M M M M M M M M
unusual noises.
M M
c. To ensure all controls are functioning.
M M M M M
, 4|Page
d. To warm up the rotor and casing.
M M M M M M
e. To ensure the lube oil system is operating correctly. -correct-answer-D
M M M M M M M M M
The warm-up time required of a turbine is dependant on:
M M M M M M M M M
a. How quickly the turbine is required.
M M M M M
b. The manufacturer's instructions.
M M
c. The size of the turbine.
M M M M
d. The type of turbine.
M M M
e. Whether the steam is dry or wet. -correct-answer-C
M M M M M M M
When shutting down a turbine, the first thing done is:
M M M M M M M M M
a. Turn off the lube oil cooling water.
M M M M M M
b. Test the emergency trip.
M M M
c. Start the auxiliary oil pump.
M M M M
d. Shut off the steam supply.
M M M M
e. Reduce the load to zero. -correct-answer-E
M M M M M
Sealing steam to the turbine glands is admitted
M M M M M M M M is put in operation
M M M
a. Before the extraction pump.
M M M
b. Before the condenser circulating water pump.
M M M M M