Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

NCCCO TOWER CRANE CERTIFICATION EXAM QUESTIONS AND CORRECT DETAILED ANSWERS LATEST VERSION 2026 (VERIFIED ANSWERS) ALREADY GRADED A+

Document preview thumbnail
Preview 3 out of 17 pages

NCCCO TOWER CRANE CERTIFICATION EXAM QUESTIONS AND CORRECT DETAILED ANSWERS LATEST VERSION 2026 (VERIFIED ANSWERS) ALREADY GRADED A+

Content preview

NCCCO TOWER CRANE CERTIFICATION EXAM
QUESTIONS AND CORRECT DETAILED ANSWERS
LATEST VERSION 2026 (VERIFIED ANSWERS)
ALREADY GRADED A+




Splices in rall tracks shall have - ANSWERS-Smooth Joints



Hydraulic systems should have their proper fluid level checked - ANSWERS-Daily



If power fails during operations, the following shouldn't apply - ANSWERS-Do your best to finish
moving load where it was designated to go



If load is undetermined who is to find out if load weight does not exceed crane rating at radius
at which the load is to be lifted - ANSWERS-Person responsible for lift



Where should climbing instructions be kept - ANSWERS-ON Site



All climbing operations shall be performed under the supervision of - ANSWERS-Qualified
person



When cranes are erected, load limiting devices shall be tested for proper setting and operation -
ANSWERS-Before crane is placed in service

,Hooks shall be equipped with latches unless the application makes the use of the latch -
ANSWERS-Impractical



Size and position of signs or panels must satisfy the limitations of - ANSWERS-Manufacturer



Fall prevention measures are needed for working at locations where you are exposed -
ANSWERS-To a fall of 6ft or more



Travel distance on hand levers shall not be greater - ANSWERS-than 14 inches from neutral
position



For power lines rated 175KV the minimum clearance between the lines and any part of the
crane or load is - ANSWERS-15ft



All controls shall be tested by the operator at the - ANSWERS-start of new shift



Before each climbing operation all load members of the support system shall be - ANSWERS-
Inspected



Chain slings are required to be - ANSWERS-ID tagged



Welding on loads suspended by the crane can only be done if the load has - ANSWERS-Insulated
slings



How much does an average cubic yard of concrete weight - ANSWERS-4,000 lbs



Main power switch for tower crane is - ANSWERS-At base of crane

, Items not listed in the frequent inspection checklist are - ANSWERS-Hydraulic pumps and valves
for excessive wear or damage



When is it necessary to determine that there is no practical alternative way to perform the
needed work or to gain access to the area - ANSWERS-Personnel Lift



Each series of voice signals shall contain three elements stated in the following order -
ANSWERS-Function and Direction - Distance and speed - Function stop



When lifting personnel communication shall be maintained between three of the next four -
ANSWERS-Person(s) being lifted - Operator - Signal person



The condition when the tower load block or hook assembly comes in contact with the upper -
ANSWERS-Two-blocking



Load bearing members of the climbing and support system shall be inspected before each -
ANSWERS-Climbing operation



Where shall a wind velocity indicating device be mounted - ANSWERS-At or near the top of
crane



A velocity readout shall be provided - ANSWERS-At the operators station



The area inside the self erecting tower cranes tail swing must be - ANSWERS-Barricaded



The self erecting tower crane must be properly grounded according with the - ANSWERS-
National electric code (NEC)

Document information

Uploaded on
March 11, 2026
Number of pages
17
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
253
Last sold
3 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions