Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SSM EXAM QUESTIONS AND ANSWERS. VERIFIED 2026.

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
02-03-2026
Written in
2025/2026

SSM EXAM QUESTIONS AND ANSWERS. VERIFIED 2026.

Institution
SSM
Course
SSM

Content preview

SSM EXAM QUESTIONS AND ANSWERS.
VERIFIED 2026.




What is NYC Chapter 33?

What is Section 3301 and 3302? - ANS Ch 33 = Safeguards During Construction or Demoltion

3301 = General

3302 = Definitions



What do you do when code does not specifically state inspection is needed on an equipment? -
ANS [3301.4.1]

Any equipment (except hand tools) that affects safety of public or property shall be inspected by
a COMPETENT PERSON designated by the contractor using the equipment



This inspection shall be documented in an inspection checklist signed and dated by the CP



Who is responsible for maintaining construction/demo signs? - ANS [3301.9]

The permit holder for the construction/demo work

If no active permits, then the building owner




@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
1

,Name the (8) items that need to be listed on a Project Information Panel - ANS [3301.9.1]

1. Rendering, elevation drawing, or zoning diagram

2. "Work in Progress" Title and specifying zoning use

3. Anticipated project completion date

4. Property owner's corporate name, address, phone #

5. Website address or phone # to contact

6. GC name and phone #

7. "To anonymously report unsafe conditions..call 311" in English and Spanish

8. Primary project permit (laminated)



Where should the Project Information Panel be posted?

How high up? - ANS [3301.9.1.2]

On the fence on each perimeter

-if the perimeter is greater than 150ft, post at each corner

- posted 4ft high from the ground to the bottom edge of the panel



Name the specs of the Project Information Panel and the (2) exceptions - ANS [3301.9.1.4]

6 ft wide x 4 ft high

Exceptions:

1) for demo project = 2'-4" wide x 4ft high

2) Sites that have street frontage less than 60 ft = 55" wide x 36.5" high



What contents should be on the SWS parapet info panel? (3) - ANS [3301.9.2.1]

1) Street address of the site

2) Name of contractor responsible for site...if not, then the owner

@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
2

, 3) The statement "For more info, visit NYC.GOV/BUILDINGS"



Name the (4) requirements of posting SWS parapet info panel - ANS [3301.9.2.2]

1) Posted along the long axis of the SWS

2) Shall not be posted above/below parapet

3) Between 3-6 feet from the left edge SWS or property line

4) Centered above project info panel on Fence



What dimension shall the SWS parapet info panel be? - ANS [3301.9.2.4]

3 ft high x 6 ft wide



When do you need site safety orientation and refresher? - ANS [3301.11]

- Orientation needed for each worker at any site that requires SSM/SSC/superintendent

- Refresher is needed after (1) year for each worker still working at the same site



Who can conduct the site safety orientation and refresher? - ANS [3301.11.3]

A qualified person designated by the permit holder

This qualified person shall have ability to communicate with each worker



What contents should be included in site safety orientation and refresher? - ANS [3301.11.4]

1) A review of safety procedures and any hazardous activities to be performed at the site

2) Information pertaining to site safety training SST as required in Section 3321



Describe how the site safety orientation and refresher is recorded - ANS [3301.11.5]

Records shall be maintained by permit holder and kept at the jobsite

@COPYRIGHT 2026/2027 ALL RIGHTS RESERVED
3

Written for

Institution
SSM
Course
SSM

Document information

Uploaded on
March 2, 2026
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$12.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
sirjoel Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
133
Member since
2 year
Number of followers
13
Documents
12799
Last sold
3 weeks ago
Sirjoel

Here you will find all documents and package deals offered by sirjoel

3.6

18 reviews

5
4
4
5
3
7
2
1
1
1

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions