Completed
PHASE 1: Preparing for CPE
1a. Read the CPE requirementsꢀto ensure
understandingꢀꢀ
Use the System Optmiiaton Proposas Paper
(NYP3) template to access tables needed for the
CPE deliverables.ꢀꢀ ꢀ
Meet with your approved industry professional
to review the CPE requirements and
deliverables.
1b.ꢀ Create a CPE task tmeline to complete the required
deliverables.
1c. ꢀꢀIdentfy informaton technology (IT) personnel who have
knowledge, skills, or expertse in the following areas:ꢀꢀ
systems maintenance (enhancements,
breaking/fixing)
monitoring system performance (dashboards,
reports)ꢀꢀ
user experience (usability, human factors, human-
computer interacton)ꢀꢀ
supportng end users (optmizaton, user manual,
help desk tckets)ꢀꢀ
evaluatng user adopton and satsfactonꢀ
1d. Create a video reflecton discussing challenges for
completng the course and solutons toꢀovercome the
challenges (minimum 5 minutes and maximum 10 minutes).
Upload the following deliverables into your e-portolioo
1e. CPE deliverable completon tmeline.
Completed Video Reflecton
PHASE 2: Maintenance and Monitoring Plan
2a.ꢀ Complete Table 7: Maintenance and Monitoring Plan from the
NYP3 System Optmizaton Proposal Paper template, notng
the following:ꢀꢀꢀ
Name of each task to be performedꢀ
Brief overview of the process for performing
the taskꢀ
Frequency or schedule of each maintenance
taskꢀ
Title of the individual who will perform each
maintenance taskꢀ
How to document the completon of the taskꢀ
Locaton where the completed document is to
be stored
A plan to measure the overall system
This study source was downloaded by 1309158 from cliffsnotes.com on 02-28-2026 12:09:26 GMT -06:00
https://www.cliffsnotes.com//study-notes/28468351