ANSWERS (VERIFIED ANSWERS) ALREADY GRADED A+
Every installation should start with a what? Ans✓✓✓A plan
What three phases make up the installation? Ans✓✓✓Pre-installation,
installation, post-installation
What is planning? Ans✓✓✓A system for achieving an objective; a
method of doing something that is worked out in advance
What is an installation? Ans✓✓✓The act of installing equipment; the
process of putting a piece or pieces of equipment or machinery in place
and making it ready for use
What should be accomplished when planning and installation?
Ans✓✓✓It should provide the what when where and how of all phases
of the installation
What two parts comprise the installation phase? Ans✓✓✓Electrical,
mechanical
What are some of the pre-installation tasks? Ans✓✓✓Aircraft
inspection, functional checks, aircraft inventory, aircraft records review
, How can you ensure that all installation tasks are completed and it stays
on time? Ans✓✓✓By planning a well-thought-out timetable by which
provides a period required, allocated, or taken to complete an activity
What are the benefits of establishing and utilizing a plan?
Ans✓✓✓Minimizes mistakes, re-work, time and cost
What should be accomplished during the post installation phase?
Ans✓✓✓Testing, inspection, documentation
What steps should you take, as the installer, to perform a successful
installation? Ans✓✓✓Have a plan established, follow guidelines/time-
tables/task listings, use manufacturers instructions,use quality parts,
report all discrepancies and problems as soon as possible
In accordance with FAR part 43, what are two types of alterations?
Ans✓✓✓Minor/Major
What types of aviation products have type certification? Ans✓✓✓If the
administrator finds that the proposed change in design, power, thrust, or
weight is so extensive that substantially complete investigation of
compliance with the applicable regulations is required.
What terms defined the two different types of installations?
Ans✓✓✓Stand-Alone, complex