BIT 3414 Quiz 6 questions with correct
answers rated A+
__________ is used to estimate the Standard Time required to perform a job. - ANS ✔✔Time
Studies
__________ is the time required by an average worker to perform a job once. - ANS
✔✔Standard Time
___________ is the elemental average time multiplied by a performance rating? - ANS
✔✔Normal Time
_________ standard time files are predetermined job element times. - ANS ✔✔Elemental
__________ motion times are times for basic micromotions. - ANS ✔✔Predetermined
Work measurement and time study were introduced by who? - ANS ✔✔Frederick W. Taylor
RF = 1.0 is a __________ worker. - ANS ✔✔Average
RF < 1.0 is a _________ worker. - ANS ✔✔Slower
RF > 1.0 is a __________ worker. - ANS ✔✔Faster
answers rated A+
__________ is used to estimate the Standard Time required to perform a job. - ANS ✔✔Time
Studies
__________ is the time required by an average worker to perform a job once. - ANS
✔✔Standard Time
___________ is the elemental average time multiplied by a performance rating? - ANS
✔✔Normal Time
_________ standard time files are predetermined job element times. - ANS ✔✔Elemental
__________ motion times are times for basic micromotions. - ANS ✔✔Predetermined
Work measurement and time study were introduced by who? - ANS ✔✔Frederick W. Taylor
RF = 1.0 is a __________ worker. - ANS ✔✔Average
RF < 1.0 is a _________ worker. - ANS ✔✔Slower
RF > 1.0 is a __________ worker. - ANS ✔✔Faster