PlanningT-TCORRECTTANSWERS-WhatTstage:
GatherTavailableTdata
PriorTtoToccupyingTTTCTzone
ConsiderTtheTneedsTofTallTusers
CoordinateTbetweenTadjacentTorToverlappingTprojects
DesignT-TCORRECTTANSWERS-WhatTstage:
SelectTbestTtrafficTcontrolTalternativeT
basedTon:Tsafety,Tmobility,Tcost,Tconstructability
TrafficTFactors,Tcharacteristics,TandTspeed.
TrafficTcontrols,TurbanTfeatures,TandTtrafficTgeneratorsT-TCORRECTTANSWERS-
WhatTFactorsTeffectTtheTdesignTofTaTTTCTplan
Long-termTstationary
Intermediate-termTstationary
short-termTstationary
short-duration
mobileT-TCORRECTTANSWERS-WhatTareTtheTMUTCDTcategoriesTofTWorkTDuration?
OccupiesTlocationTmoreTthanT3Tdays
largerTchannelizingTdevicesTandTpostTmountedTsigns
conflictingTroadwayTmarkingsTremovedTandTreplacedTwithTtemporaryTmarkings
coverTorTremoveTconflictingTsignageT-TCORRECTTANSWERS-Long-
termTstationaryT(MUTCDTworkTdurationTcategory)
MoreTthanT1Tday,TlessTthanT3Tdays
NightimeTworkTofTmoreTthanT1ThourT-TCORRECTTANSWERS-Intermediate-
stationaryT(MUTCDTworkTdurationTcategory)
DaytimeTworkT1TtoT12Thours
conesTandTportableTsignsT-TCORRECTTANSWERS-Short-termTstationaryT(MUTCDTworkTdurationTcategory)
workTthatTmovesTintermittentlyTorTcontinuously
MayTuseTtruck-mountedTimpactTattenuatorsT-TCORRECTTANSWERS-
MobileT(MUTCDTworkTdurationTcategory)
ConstructabilityT-TCORRECTTANSWERS-NatureTofTtheTwork
accessTrequirements
drainageTissues,TdrainageTduringTconstruction
constructionTequipment
sizeTofTworkTspace