CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+

Institution
CQM-C
Course
CQM-C









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CQM-C
Course
CQM-C

Document information

Uploaded on
January 28, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CQM Course Questions



A cumulative list of job deficiencies/rework items can be found in: - ANS>>Quality
Control Report

Contractor benefits of CQM - ANS>>Increased profit and production, better
communications, planning, improved organizational skills, and outstanding performance
evaluations to obtain future contracts.

contractor quality control function - ANS>>To assure that the completed project meets
all quality requirements of the contract.

Purpose of CQM - ANS>>The government's efforts, separate from, but in coordination
and cooperation with the contractor, assure that the quality set by the plans and
specifications is achieved.

Two factors cause construction industry to become highly specialized - ANS>>changing
markets and increased tech and regulations

Factor that will influence both government and construction industry in the future -
ANS>>New government regulations, greater influence from consumer, improvement in
QC and QA requirements, construction-oriented management info systems, formal
partnering involving stakeholders, more reliance on design-build, more considerate for
live cycle requirements and increased based incentives

A definable feature of work: - ANS>>Can consist of a combination of multiple
specification sections depending upon the nature of the work

Actual construction on the jobsite begins: - ANS>>After an interim or final QC is
accepted

All submittals for government approval must be provided by the _________________ in
time to allow for the review, approval, procurement, delivery, and performance of
preparatory phase for an item before it is needed for construction. - ANS>>Contractor to
the Government

An effective contractor quality control program will - ANS>>Be an incentive for work to
be done correctly the first time resulting in earlier completion, reduced field overhead
costs, and greater profits

, Characteristics that describe a definable feature of work include: - ANS>>Cross-
referenced listings to the contractor's construction schedule that may have more than
one definable feature under a section of the specifications

Construction Quality Management is the performance of tasks, which ensure that
construction is performed: - ANS>>According to plans and specifications, on time,
within a defined budget and a safe work environment

Contractor testing procedures: - ANS>>are outlined in the Quality Control Plan as
defined by section 0145N/01451A and addressed at the Coordination and Mutal
Understanding Meeting (Navy).

Control is - ANS>>A continual system of planned future activities (its preventative)

Design-Build contracts require - ANS>>The QC Manager to be in place and take an
active role in the review and coordination of the design.

During the punch-out inspection of a project: - ANS>>The contractor prepares a punch
list and makes corrections

ENG Form 4288-R, the submittal register - ANS>>identifies this submittals requiring
government approval

Ground for withholding payment include the contractor's failure to - ANS>>Perform in
accordance with the terms of the contract, provide an acceptable Quality Control Plan
giving assurance of intent and ability to comply with quality standards, and build to the
quality standards established by the contract

If initial review of the quality control plan shows it to be unacceptable - ANS>>The
contractor makes changes before acceptance

If the contractor does not provide an adequate superintendent, the contract allows the
contracting officer to - ANS>>Require the contractor to assume personal supervision of
the work

If there is a disagreement whether the contractor's work complies with the contract: -
ANS>>The government makes the final determination

In a design build contract, if the contractor has a question about the design, what is the
process to get an answer? - ANS>>Contractor submits a Design Verification
Clarification Request (DVCR) to the contractor's design team

Inspection is: - ANS>>The process by which ongoing and completed work is examined

It is the responsibility of Quality Assurance Personnel to - ANS>>Periodically verify that
the contractor's system of control is working effectively
$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
FIRSTCLASS2

Get to know the seller

Seller avatar
FIRSTCLASS2 100% OWN RESEARCH CONTENT.
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
7 months
Number of followers
1
Documents
145
Last sold
3 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions