100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+

Rating
-
Sold
-
Pages
4
Grade
A+
Uploaded on
28-01-2026
Written in
2025/2026

CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+

Institution
CQM-C
Course
CQM-C








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CQM-C
Course
CQM-C

Document information

Uploaded on
January 28, 2026
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CQM-C Certification

The ______ consists of daily checks of the work to assure continuing compliance with
pp pp pp pp pp pp pp pp pp pp pp pp pp



contract requirements - ANS>>Follow-up phase
pp pp pp pp pp




Design-Build contracts require: - ANS>>*The QC Manager to be in place and take an
pp pp pp pp pp pp pp pp pp pp pp pp pp



active role in the review and coordination of the design*
pp pp pp pp pp pp pp pp pp pp




Which of the following is included in all three phases of the Three Phases of Control -
pp pp pp pp pp pp pp pp pp pp pp pp pp pp pp pp



ANS>>Safety
pp




The purpose of Construction Quality Management is to - ANS>>*Achieve the quality
pp pp pp pp pp pp pp pp pp pp pp



established by properly developed requirements through the combined responsibility,
pp pp pp pp pp pp pp pp pp



but separate, efforts of contractor and Government personnel*
pp pp pp pp pp pp pp pp




Testing is extremely important in Construction Quality Management and is performed
pp pp pp pp pp pp pp pp pp pp



by - ANS>>Both the contractor and the Government
pp pp pp pp pp pp pp pp




The primary purpose of the Three-Phase Control System is to: - ANS>>Require the
pp pp pp pp pp pp pp pp pp pp pp pp



contractor to plan, schedule, and perform quality management actions to assure work
pp pp pp pp pp pp pp pp pp pp pp pp



meets all specified quality standards
pp pp pp pp pp




Quality Assurance Personnel have the responsibility to: - ANS>>*require the
pp pp pp pp pp pp pp pp pp



contractor to maintain the quality specified in the plans and specifications*
pp pp pp pp pp pp pp pp pp pp pp




the ____ is the appropriate time to assure that all materials and/or equipment have
pp pp pp pp pp pp pp pp pp pp pp pp pp



been tested. submitted, and approved. - ANS>>Preparatory Phase
pp pp pp pp pp pp pp pp




The Preconstruction Conference and the Coordination and Mutual Understanding
pp pp pp pp pp pp pp pp



Meeting are: - ANS>>conducted prior to the commencement of any physical
pp pp pp pp pp pp pp pp pp pp pp



construction work
pp pp




Contractor testing procedures: - ANS>>are specified in the technical specifications,
pp pp pp pp pp pp pp pp pp



outlined in the Quality Control Plan, and addressed at the Coordination and Mutual
pp pp pp pp pp pp pp pp pp pp pp pp pp



Understanding Meeting.
pp pp




The Quality Control Plan contains: - ANS>>Identification of individual quality control
pp pp pp pp pp pp pp pp pp pp



personnel, including name, qualifications, assigned duties, responsibilities and
pp pp pp pp pp pp pp pp



authorities
pp




Tests that are unnanounced, randomly performed, and repeat quality control tests are:
pp pp pp pp pp pp pp pp pp pp pp



- ANS>>quality assurance tests
pp pp pp pp
$12.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
FIRSTCLASS2

Get to know the seller

Seller avatar
FIRSTCLASS2 100% OWN RESEARCH CONTENT.
View profile
Follow You need to be logged in order to follow users or courses
Sold
1
Member since
7 months
Number of followers
1
Documents
145
Last sold
3 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions