Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+

Document preview thumbnail
Preview 1 out of 4 pages

CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+CQM-C EXAM QUESTIONS AND ANSWERS GRADED A+

Content preview

CQM-C Certification

The ______ consists of daily checks of the work to assure continuing compliance with
pp pp pp pp pp pp pp pp pp pp pp pp pp



contract requirements - ANS>>Follow-up phase
pp pp pp pp pp




Design-Build contracts require: - ANS>>*The QC Manager to be in place and take an
pp pp pp pp pp pp pp pp pp pp pp pp pp



active role in the review and coordination of the design*
pp pp pp pp pp pp pp pp pp pp




Which of the following is included in all three phases of the Three Phases of Control -
pp pp pp pp pp pp pp pp pp pp pp pp pp pp pp pp



ANS>>Safety
pp




The purpose of Construction Quality Management is to - ANS>>*Achieve the quality
pp pp pp pp pp pp pp pp pp pp pp



established by properly developed requirements through the combined responsibility,
pp pp pp pp pp pp pp pp pp



but separate, efforts of contractor and Government personnel*
pp pp pp pp pp pp pp pp




Testing is extremely important in Construction Quality Management and is performed
pp pp pp pp pp pp pp pp pp pp



by - ANS>>Both the contractor and the Government
pp pp pp pp pp pp pp pp




The primary purpose of the Three-Phase Control System is to: - ANS>>Require the
pp pp pp pp pp pp pp pp pp pp pp pp



contractor to plan, schedule, and perform quality management actions to assure work
pp pp pp pp pp pp pp pp pp pp pp pp



meets all specified quality standards
pp pp pp pp pp




Quality Assurance Personnel have the responsibility to: - ANS>>*require the
pp pp pp pp pp pp pp pp pp



contractor to maintain the quality specified in the plans and specifications*
pp pp pp pp pp pp pp pp pp pp pp




the ____ is the appropriate time to assure that all materials and/or equipment have
pp pp pp pp pp pp pp pp pp pp pp pp pp



been tested. submitted, and approved. - ANS>>Preparatory Phase
pp pp pp pp pp pp pp pp




The Preconstruction Conference and the Coordination and Mutual Understanding
pp pp pp pp pp pp pp pp



Meeting are: - ANS>>conducted prior to the commencement of any physical
pp pp pp pp pp pp pp pp pp pp pp



construction work
pp pp




Contractor testing procedures: - ANS>>are specified in the technical specifications,
pp pp pp pp pp pp pp pp pp



outlined in the Quality Control Plan, and addressed at the Coordination and Mutual
pp pp pp pp pp pp pp pp pp pp pp pp pp



Understanding Meeting.
pp pp




The Quality Control Plan contains: - ANS>>Identification of individual quality control
pp pp pp pp pp pp pp pp pp pp



personnel, including name, qualifications, assigned duties, responsibilities and
pp pp pp pp pp pp pp pp



authorities
pp




Tests that are unnanounced, randomly performed, and repeat quality control tests are:
pp pp pp pp pp pp pp pp pp pp pp



- ANS>>quality assurance tests
pp pp pp pp

Document information

Uploaded on
January 28, 2026
Number of pages
4
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
1
Items
170
Last sold
9 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions