CONTRACTORS CCB 2026
FINAL PRACTICE PAPER
PRACTICE TEST BANK WITH
ANSWER SOLUTIONS
◉ Contracts with residential property owners for over
___________ must be in writing under CCB rules. Answer:
$2,000
◉ If a contractor solicits services at the consumer's home, the
buyer has how many days to cancel the contract? Answer: 3
days
◉ What determines the state unemployment tax rate? Answer:
The history of unemployment claims against the employer.
◉ True or False: Compliance with a Stop Work Order is
optional. Answer: False
◉ A lien is foreclosed by filing a lawsuit within how many days
after recording? Answer: 120 days.
◉ What is the most common form of construction contracting?
Answer: Single Prime Contracting
◉ Who is responsible for preparing the SDS (Safety Data
Sheet)? Answer: The chemical manufacturer.
◉ What test does BOLI apply to determine if an individual is an
employee or independent contractor? Answer: Economic
realities test
, ◉ What are the advantages of progress payments? Answer:
Protect the owner by holding the contractor responsible for
following the planned schedule.
◉ What must a general contractor provide for projects over $1
million? Answer: Flush toilets and washing facilities.
◉ True or False: The CCB will accept and determine damages
against an unlicensed contractor. Answer: False
◉ A Responsible Managing Individual (RMI) is: Answer:
Either an owner of the business applying for the license or an
employee designated by the applicant.
◉ True or False: An on-site host employer is responsible for
ensuring a safe place of employment for leased or temporary
workers. Answer: True
◉ What does the Oregon Family and Medical Leave Act
(OFLA) provide? Answer: Unpaid leave of absence for up to 12
weeks for qualifying family or medical reasons.
◉ Who is responsible for providing personal protective
equipment (PPE)? Answer: The contractor/employer.
◉ What are the possible consequences for a contractor failing to
provide Owner About Construction Liens information? Answer:
Fines, loss of lien rights, and CCB license suspension.
◉ What must be on file for a contractor to renew an active or
reactivated license? Answer: A current bond, a Certificate of
Insurance, and evidence of completed continuing education.
◉ How long does the subcontractor have to supply the property
owner with the Notice of Right to Lien? Answer: 8 working
days.