100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2026

Rating
-
Sold
-
Pages
7
Grade
A+
Uploaded on
24-01-2026
Written in
2025/2026

VA DEQ SWM Inspector Exam Questions and Correct Answers Latest Update 2026

Institution
VA Deq Swm Inspector
Course
VA deq swm inspector









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
VA deq swm inspector
Course
VA deq swm inspector

Document information

Uploaded on
January 24, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

VA DEQ SWM Inspector Exam Questions and
Correct Answers Latest Update 2026
Define LDA - ANSWER-Land disturbing activity; any man-made change to the land
surface that potentially changes its runoff characteristics; includes clearing, grading, and
excavation.


What size LDA must comply with stormwater management regulation? in CPBA areas?
- ANSWER-anything of 1 acre or more, or 2500 ft^2 in CPBA areas; may be more
stringent locally.


what are some activities exempt from SWM regulations? - ANSWER-mining,
agriculture, sewer discharges, local reclamation programs, routine maintenance of
preexisting operations, public emergency activity


what term basically means a plea deal for stormwater offenders? - ANSWER-consent
order, which replaces penalties with fines.


how long does VSMP authority have to review SWM plan? - ANSWER-15 days to
review and determine approval, and notify applicant.
What element is targeted by water quality criteria? - ANSWER-Phosphorous, it indicates
pollution by bonding with other pollutants.


At what % impervious cover are streams substantially affected? - ANSWER-25%


what is the site-based load limit for water quality? - ANSWER-0.41 lbs/acre/yr total
phosphorous


Virginia Runoff Reduction Method- method of load calculations - ANSWER-load
calculations based on land cover type and soil type.

, what must happen to potentially harmful sheet flow runoff? - ANSWER-Must be diverted
to stormwater conveyance system.


SWM ponds must be able to convey water safely up to what level storm event? -
ANSWER-must be able to safely convey up to a 100 yr storm.


How often must a VSMP authority inspect an LDA? - ANSWER-Periodically.


all SWPPP requirements may be met by - ANSWER-incorporating other plans into
reference, or by developing missing elements.


What must the DEQ issue to an operator before an LDA? - ANSWER-a construction GP


How soon after final grade of a site must vegetation be put in place? - ANSWER-within
7 days.


How long must operator keep routine inspection reports? - ANSWER-At least 3 years
after the GP expires/terminates.


How long does operator have to revise SWPPP if authority deems it necessary? How
long does local authority have to review any modifications to SWPPP? - ANSWER-7
days for operator to make changes, 60 days for authority to review changes.


How long does operator have to notify DEQ of an unauthorized discharge? How long
does operator have to make a written report of this? - ANSWER-within 24 hours of
discovery for notification, within 5 days for written acknowledgement.


What constitutes a measurable rain event according to GP? - ANSWER-0.25 in. or
more over 24 hours.
$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
LeeErickson

Get to know the seller

Seller avatar
LeeErickson Chamberlain College Of Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
2
Member since
8 months
Number of followers
0
Documents
1454
Last sold
2 months ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions