100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CNST 403 Exam 1 Questions and Answers (Latest Update 2026).docx

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
23-01-2026
Written in
2025/2026

CNST 403 Exam 1 Questions and Answers (Latest Update 2026).docx

Institution
CNST
Course
CNST









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CNST
Course
CNST

Document information

Uploaded on
January 23, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CNST 403 Exam 1 Questions and
Answers (Latest Update 2026)

Draw and describe what it would look like if you chose a "Design
then Construct" process. -
correct answer ✅Design is completed first, then bidding and
construction proceed.


Draw and describe what it would look like if you chose a "Fast
Tracking" process. -
correct answer ✅The design work is performed in phases, with
each phase put out to bid separately.


Draw and describe what it would look like if you chose a "Design-
Build" process. -
correct answer ✅The contract is awarded to a single organization
for both design and construction services.


Describe the design-build process as well as some of the benefits. -
correct answer ✅The owner, design, and contractor operate
together in a team, with valuable input from the contractor in the
design stage.


Time and costs can be reduced since design and construction can,
to an extent, be performed in tandem.

, CNST 403 Exam 1 Questions and
Answers (Latest Update 2026)

Draw what it might look like if in design build the design team are a
division within the contractor's organization. Alternatively, a
contractor and an architecture-engineering firm establish a joint-
venture for the project. -
correct answer ✅


What is a joint venture? -
correct answer ✅A business arrangement in which two or more
parties agree to pool their resources for the purpose of
accomplishing a specific task.


Draw and describe what it would look like if you chose a
"Construction Management" process. -
correct answer ✅The owner employs a firm to provide the
management of the project, or part thereof.


The construction management firm is typically selected by
qualification and through a process of negotiation.


Describe competitive bidding process. -
correct answer ✅Several contractors bid, within a competitive
environment, to perform the work.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Chloelunar University Of Nevada-Las Vegas
View profile
Follow You need to be logged in order to follow users or courses
Sold
68
Member since
1 year
Number of followers
7
Documents
11041
Last sold
3 days ago

Get study materials, exam answer packs, step-by-step assignment solutions, and much more. Learn more effectively and quickly. After acquiring any document, please always provide a review to ensure that our consumers are completely satisfied.Best Wishes!!!!!!

3.6

13 reviews

5
5
4
4
3
1
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions