100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

CNST 201 Week 3 PPTS Exam Questions and Answers (Latest Update 2026).docx

Rating
-
Sold
-
Pages
9
Grade
A+
Uploaded on
23-01-2026
Written in
2025/2026

CNST 201 Week 3 PPTS Exam Questions and Answers (Latest Update 2026).docx

Institution
CNST
Course
CNST









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CNST
Course
CNST

Document information

Uploaded on
January 23, 2026
Number of pages
9
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CNST 201: Week 3 PPTS Exam
Questions and Answers (Latest Update
2026)
Why is light-frame construction used (3)? -
correct answer ✅- very flexible construction system
- insulated, sealed, and waterproofed to facilitate long life and low
maintenance
- almost ANY climate and on ANY site with an adequate foundation


What is panelized construction? -
correct answer ✅pre-assembled sections of the building such as
floor, wall, and roof systems. Sections are built in the factory and
shipped to the site.


How many stories does the IBC allow for in wood-frame
construction? -
correct answer ✅up to 5


The IBC includes 3 new construction types that allow the use of
mass timber in buildings up to how many stories (3 answers)? -
correct answer ✅up to 18, 12, and 9 stories

, CNST 201: Week 3 PPTS Exam
Questions and Answers (Latest Update
2026)
How many stories does a building have to be up to for the 2024 IBC
to allow 100% exposed timber ceilings? -
correct answer ✅up to 12


What are the 5 stages in wood light-frame construction (in order)? -
correct answer ✅Site preparation, foundation, framing type, floor
framing, and wall framing.


What are the 4 things to be done during site preparation? -
correct answer ✅Building permit, clearing and grubbing, layout
(with stakes at the corners of the building and lot), and site points
are found based on known elevation.


What is clearing and grubbing? -
correct answer ✅site is cleared of trees, plantings, and topsoil


Why does the contractor use the surveyor's layout stakes? -
correct answer ✅to lay out the building footprint for the excavator


What are the footings made of in light-frame construction? -
correct answer ✅reinforced CIP concrete

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Chloelunar University Of Nevada-Las Vegas
View profile
Follow You need to be logged in order to follow users or courses
Sold
68
Member since
1 year
Number of followers
7
Documents
11041
Last sold
3 days ago

Get study materials, exam answer packs, step-by-step assignment solutions, and much more. Learn more effectively and quickly. After acquiring any document, please always provide a review to ensure that our consumers are completely satisfied.Best Wishes!!!!!!

3.6

13 reviews

5
5
4
4
3
1
2
0
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions