DBIA Test Questions 2025–2026 | Converted with Correct Detailed Answers

Document preview thumbnail
Preview 3 out of 19 pages

Master DBIA certification with this fully converted 2025–2026 test guide. Includes verified questions and detailed correct answers, comprehensive rationales, and exam-focused content aligned with current Design-Build Institute of America (DBIA) standards to ensure confident preparation and top-score performance.

Content preview

DBIA TEST QUESTIONS AND CORRECT DETAILED
DBIA TESTANSWERS.pdf
QUESTIONS AND CORRECT
DBIA
DETAILED
TEST QUESTIONS
ANSWERS AND CORRECT DETAILED ANSWERS.pdf




DBIA TEST QUESTIONS AND
CORRECT DETAILED ANSWERS

Project Delivery System

How team members are organized, establishes when parties engage, determines roles of parties, and
determines sequence of design, procurement, and construction (db, cmar, dbb)




Procurement Method

how team members are selected (QBS, best value, low price, sole source)




contracting approach

how team members are paid (fp, gmp, cost reimbursement, target price, unit price)




Design-Bid-Build (DBB)

linear, sequential process, A/E selected on qualifications, GC selected on low price, design is fully
completed without input from GC, A/E acting in owner's interests, with a historically strong bond,
process is well-established and understood




construction manager at risk

similar org structure to DBB, construction manager selected by QBS or best value, contractor provides
precon services, negotiated gmp contracting approach, open book estimating process, potential to fast
track project, construction cost determined before design completed, potential issues over what is
reasonably inferable from gmp design documents




DBIA TEST QUESTIONS AND CORRECT DETAILED
DBIA TESTANSWERS.pdf
QUESTIONS AND CORRECT
DBIA
DETAILED
TEST QUESTIONS
ANSWERS AND CORRECT DETAILED ANSWERS.pdf

,DBIA TEST QUESTIONS AND CORRECT DETAILED
DBIA TESTANSWERS.pdf
QUESTIONS AND CORRECT
DBIA
DETAILED
TEST QUESTIONS
ANSWERS AND CORRECT DETAILED ANSWERS.pdf




Design-Build

The owner contracts with one entity (a person or firm) to provide both design and construction services,
designer and contractor have a direct contractual relationship, selected by QBS or best value, wide
spectrum of contracting approaches and organizational structures, single point responsibility, owner
does not manage designer, owner exposure to claims is significantly reduced




engineer procure construct (epc)

similar to design build, in industrial and power generation sectors, systems and performance testing are
central to scope, contractor will typically perform engineering with its in-house staff, owner has need for
single point responsibility, contracts include plant and process performance guarantees, contract items
include performance and schedule liquidated damages and limitations of liability




Multiple Prime Contracting

owner contracts with multiple trade contractors, attributes are typically similar to dbb, owner's ability to
schedule and coordinate the work




Integrated Project Delivery (IPD)

multi-party agreement - all parties equal, QBS procurement and target pricing contract approach,
private sector use (limited at this time), key: owner's ability to accept risk




public-private partnership (p3)

Instead of government building and maintaining major infrastructure (such as highway, water treatment
plant), build and maintenance is outsourced to a private company. Opposed by public sector unions. this
is not considered a delivery system but its underlying approaches are delivery systems and typically use
DB. multiple procurement and contracting approaches




shift left




DBIA TEST QUESTIONS AND CORRECT DETAILED
DBIA TESTANSWERS.pdf
QUESTIONS AND CORRECT
DBIA
DETAILED
TEST QUESTIONS
ANSWERS AND CORRECT DETAILED ANSWERS.pdf

, DBIA TEST QUESTIONS AND CORRECT DETAILED
DBIA TESTANSWERS.pdf
QUESTIONS AND CORRECT
DBIA
DETAILED
TEST QUESTIONS
ANSWERS AND CORRECT DETAILED ANSWERS.pdf




intense efforts to establish scope early in the process; drives early team formation to include key trade
subcontractors; can enable big decisions to be made early, affect project outcomes at lowest cost,
establish a need for co-location and collaboration, and compress time during concurrent design and
construction




traditional design build

typically two-phase best value procurement with lump sum contract; owner defines project
requirements and scope of prescriptive work; use of performance-based technical requirements with
limited prescriptive specifications




progressive design build

design and price are progressively developed after the design-builder is under contract; final project cost
and schedule commitment is not established as part of the selection process; two phases: preliminary
services and final design and construction services




criteria documents

describe the end result




bridging documents

prescribes how to achieve the end result




design bid build paradigm

prior to bidding, owner undertakes a process to design the project and all of its details to 100%
complete plans and specs. the owner is therefore responsible for success or failure of details of the
design, and warrants the sufficiency of design to the contractor. the owner is therefore liable to the
contractor for any gaps between plans and specifications and owner's requirements for project
performance




DBIA TEST QUESTIONS AND CORRECT DETAILED
DBIA TESTANSWERS.pdf
QUESTIONS AND CORRECT
DBIA
DETAILED
TEST QUESTIONS
ANSWERS AND CORRECT DETAILED ANSWERS.pdf

Document information

Uploaded on
January 22, 2026
Number of pages
19
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$21.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
emailone
4.3
(181)
Sold
2206
Followers
1
Items
497
Last sold
1 week ago


Reviews from verified buyers



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions