Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 88 pages
Exam (elaborations)

AICM Certified Construction Risk Analyst CCRA Exam

Document preview thumbnail
Preview 4 out of 88 pages

The Certified Construction Risk Analyst (CCRA) Exam focuses on analytical approaches to identifying, evaluating, and mitigating construction risks. It includes quantitative risk analysis, forecasting, scenario planning, and decision support. Certified analysts provide data-driven insights to support risk-informed project management decisions.

Content preview

AICM Certified Construction Risk Analyst CCRA
Exam
**Question 1.** Which of the following tools is primarily used to break down project risks into
hierarchical categories?

A) Monte Carlo simulation

B) Risk Breakdown Structure (RBS)

C) Earned Value Management

D) Critical Path Method

Answer: B

Explanation: An RBS organizes risks in a tree‑like hierarchy, making it easier to identify, assess,
and manage them.



**Question 2.** In a SWOT analysis for a construction project, the “Opportunities” component
refers to:

A) Internal strengths that can be leveraged

B) External factors that could benefit the project

C) Internal weaknesses that must be corrected

D) External threats that could harm the project

Answer: B

Explanation: Opportunities are external conditions or trends that, if exploited, can improve
project performance.



**Question 3.** Which PESTLE factor most directly influences the selection of construction
materials in a coastal infrastructure project?

A) Political

B) Economic

C) Environmental

D) Technological

Answer: C

, AICM Certified Construction Risk Analyst CCRA
Exam
Explanation: Environmental considerations such as corrosion from saltwater dictate material
choices for coastal works.



**Question 4.** A construction firm sets a risk appetite of “low” for schedule overruns. This
means the firm:

A) Accepts any schedule delay without action

B) Actively seeks to eliminate all schedule risks

C) Tolerates only minimal schedule deviations and implements strong mitigation

D) Transfers all schedule risk to subcontractors

Answer: C

Explanation: Low risk appetite indicates a preference for tight control and proactive mitigation
of schedule risks.



**Question 5.** Which of the following is the most appropriate first step when conducting
on‑site hazard identification?

A) Performing a Monte Carlo simulation

B) Reviewing the project charter

C) Walking the site with a safety checklist

D) Calculating Expected Monetary Value (EMV)

Answer: C

Explanation: Direct observation using a safety checklist is the initial practical method for
identifying on‑site hazards.



**Question 6.** When assessing geotechnical risk, which parameter is least likely to be
considered?

A) Soil bearing capacity

B) Groundwater table depth

, AICM Certified Construction Risk Analyst CCRA
Exam
C) Local labor union agreements

D) Potential for soil liquefaction

Answer: C

Explanation: Labor union agreements relate to operational risk, not geotechnical conditions.



**Question 7.** In the context of operational risk, a “supply chain disruption” is best classified
as:

A) External threat

B) Internal weakness

C) Strength

D) Opportunity

Answer: A

Explanation: Supply chain disruptions originate outside the organization and threaten project
delivery.



**Question 8.** Which document serves as the central repository for all identified risks, their
analysis, and response plans?

A) Project Management Plan

B) Risk Register

C) Change Log

D) Issue Log

Answer: B

Explanation: The Risk Register records each risk, its probability, impact, owner, and mitigation
strategy.



**Question 9.** In a Probability‑Impact Matrix, a risk plotted in the “high‑high” quadrant
should be:

, AICM Certified Construction Risk Analyst CCRA
Exam
A) Accepted without action

B) Monitored only if it occurs

C) Prioritized for immediate mitigation

D) Transferred to a third party automatically

Answer: C

Explanation: High probability and high impact risks demand prompt and robust mitigation
actions.



**Question 10.** Monte Carlo simulation is most useful for:

A) Qualitatively ranking risks

B) Determining the exact date a risk will occur

C) Generating a probability distribution of project outcomes

D) Identifying root causes of risks

Answer: C

Explanation: Monte Carlo runs many iterations to produce a statistical distribution of possible
outcomes.



**Question 11.** Sensitivity analysis primarily helps a risk analyst to:

A) Estimate the financial loss of each risk

B) Identify which input variables most affect project objectives

C) Create a detailed risk response plan

D) Conduct stakeholder interviews

Answer: B

Explanation: Sensitivity analysis shows how changes in variables (e.g., duration, cost) influence
results, highlighting critical risks.

Document information

Uploaded on
January 21, 2026
Number of pages
88
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$85.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
teamdiginova1
4.0
(2)
Sold
22
Followers
1
Items
29173
Last sold
1 month ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions