Walmart Sam's Safety, Employment, Waste, Stormwater || || || || || ||
Compliance Certification Exam with accurate detailed || || || || || ||
answers
The 1970's law that regulated stormwater is: - ✔✔the Clean Water Act
|| || || || || || || || || || ||
Regulation outlining stormwater management on construction sites: - ✔✔NPDES
|| || || || || || || ||
Never allowable stormwater discharge from a construction site: - ✔✔discharge from
|| || || || || || || || || || ||
contaminated groundwater ||
When can the notice of termination be filed? - ✔✔all construction activity is complete and
|| || || || || || || || || || || || || || ||
permanent stabilization meets permit requirements
|| || || ||
What must occur before construction starts for stormwater permitting? - ✔✔submit the
|| || || || || || || || || || || ||
notice of termination (NOT)
|| || ||
When must the stormwater notice of intent (NOI) be submitted? - ✔✔after the SWPPP is
|| || || || || || || || || || || || || || ||
prepared and before starting construction
|| || || ||
Potential pollutant sources on a construction site may include: - ✔✔all of the above
|| || || || || || || || || || || || ||
How can the SWPPP implementation sequence be modified? - ✔✔after consulting with the
|| || || || || || || || || || || || ||
project SWPPP designer and receiving written approval
|| || || || || ||
What is not shown on a SWPPP site map? - ✔✔Notices of Violation
|| || || || || || || || || || || ||
, 2
What information should be posted at the site entrance? - ✔✔all of the above
|| || || || || || || || || || || || ||
Which of the following is not a beneficial use of water? - ✔✔Flushing a spill down a storm
|| || || || || || || || || || || || || || || || || ||
drain
When installing and maintaining a check dam, what should you ensure? - ✔✔The low
|| || || || || || || || || || || || || ||
point (overflow) of the check dam is in the middle of the channel
|| || || || || || || || || || || ||
How can you reduce the possibility of undercutting in channels? - ✔✔Install filter fabric
|| || || || || || || || || || || || || ||
under rock and similar placed within the stormwater conveyance
|| || || || || || || ||
What must the good housekeeping section of the SWPPP include? - ✔✔Post construction
|| || || || || || || || || || || || ||
stormwater management procedures || ||
Which erosion control best management practice increases water infiltration? -
|| || || || || || || || || ||
✔✔Vegetation
Of the following factors that influence erosion rates, which one can a contractor control the
|| || || || || || || || || || || || || || ||
most? - ✔✔Groundcover
|| ||
When should temporary stabilization be implemented? - ✔✔Immediately on all disturbed
|| || || || || || || || || || ||
areas that are likely to or will remain inactive for 14-days or more
|| || || || || || || || || || || ||
What is the primary purpose of a construction exit? - ✔✔To remove sediment from
|| || || || || || || || || || || || || ||
construction site vehicles and minimize trackouts || || || || ||
Common types of erosion include all the following except - ✔✔Sedimentation
|| || || || || || || || || ||