Questions And Correct Answers (Verified
Answers) Plus Rationales 2026 Q&A | Instant
Download Pdf
1. The primary legislation governing electrical installations in Alberta
is
A. Alberta Building Code
B. Canadian Electrical Code only
C. Safety Codes Act
D. Occupational Health and Safety Act
The Safety Codes Act is the provincial legislation that adopts and
enforces electrical codes in Alberta.
2. The Alberta Electrical Utility Code primarily applies to
A. Residential branch circuits
B. Commercial tenant improvements
C. Supply and distribution systems owned by utilities
D. Temporary construction wiring
The Utility Code governs electrical systems up to and including
utility-owned distribution.
3. The Canadian Electrical Code (CEC) is adopted in Alberta under
A. Municipal bylaws
B. Federal regulation
C. Provincial regulation through the Safety Codes Act
, D. Utility company standards
Provinces adopt the CEC through their own legislation.
4. The main purpose of the Canadian Electrical Code is to
A. Reduce installation costs
B. Standardize equipment brands
C. Ensure safety of persons and property
D. Improve electrical efficiency
The CEC is a safety code, not a design or efficiency standard.
5. Rule 2-100 of the CEC relates to
A. Bonding methods
B. Conductor sizing
C. Approval of electrical equipment
D. Overcurrent protection
Rule 2-100 requires electrical equipment to be approved and
certified.
6. Electrical equipment approval in Alberta must be by
A. The installer
B. The manufacturer
C. An accredited certification body
D. The local utility
Only accredited agencies can approve electrical equipment.
7. A permit for electrical work in Alberta is generally required
A. Only for commercial work
B. Only for high-voltage systems
C. Before electrical work begins
D. After final inspection
Permits must be obtained prior to starting regulated work.
, 8. Who is responsible for obtaining an electrical permit?
A. The property owner only
B. The safety codes officer
C. The contractor or homeowner performing the work
D. The utility provider
The person doing the work is responsible for the permit.
9. Electrical work without a permit may result in
A. No consequences
B. Only a warning
C. Fines or orders under the Safety Codes Act
D. Automatic utility disconnection
The Act allows enforcement actions for non-compliance.
10. A Safety Codes Officer (SCO) is authorized to
A. Design electrical systems
B. Install electrical equipment
C. Inspect and enforce compliance
D. Approve uncertified equipment
SCOs enforce compliance but do not perform installations.
11. Bonding conductors are primarily intended to
A. Carry load current
B. Improve power quality
C. Provide a low-impedance fault path
D. Reduce voltage drop
Bonding ensures fault current can operate protective devices.
12. Grounding in electrical systems mainly serves to
A. Protect equipment only
B. Increase circuit capacity