. Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides1 included
ofassessment
30 qualifying
for effective
preparation.Georgia
examination
assessment
Questions
preparation.
Construction
and Answers
Site Supervisor
+ Rationales
Exam Que
Georgia Construction Site Supervisor Exam
Questions And Correct Answers (Verified
Answers) Plus Rationales 2026 Q&A | Instant
Download Pdf
1. What is the primary responsibility of a construction site
supervisor?
A. Performing manual labor on site
B. Overseeing daily operations and ensuring safety compliance
C. Designing building plans
D. Selling construction materials
The construction site supervisor is responsible for managing site
operations and ensuring that all activities comply with safety
regulations.
2. Which of the following is the most effective method for preventing
on-site accidents?
A. Waiting for inspections
B. Implementing a comprehensive safety program
C. Using cheaper materials
D. Hiring more workers
Proactive safety programs reduce accidents by addressing hazards
before they result in injury.
3. When a worker is injured on-site, what is the supervisor’s first
action?
Page 1 of 30 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.
,. Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides2 included
ofassessment
30 qualifying
for effective
preparation.Georgia
examination
assessment
Questions
preparation.
Construction
and Answers
Site Supervisor
+ Rationales
Exam Que
A. Complete a performance review
B. Ensure the worker receives immediate medical attention
C. Continue work without interruption
D. Notify the media
Immediate medical attention is critical for worker safety and legal
compliance.
4. Which of the following documents must a site supervisor maintain
for OSHA compliance?
A. Financial records
B. Injury and illness logs
C. Personal emails
D. Marketing plans
OSHA requires documentation of workplace injuries and illnesses to
monitor safety and compliance.
5. What is the purpose of a pre-construction meeting?
A. To negotiate prices
B. To discuss project scope, safety, and responsibilities
C. To train workers on machinery
D. To organize recreational activities
Pre-construction meetings align all stakeholders on project expectations
and safety protocols.
6. Which type of hazard is associated with working at heights?
A. Chemical
B. Electrical
C. Fall
D. Ergonomic
Page 2 of 30 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.
, . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides3 included
ofassessment
30 qualifying
for effective
preparation.Georgia
examination
assessment
Questions
preparation.
Construction
and Answers
Site Supervisor
+ Rationales
Exam Que
Falls are the primary risk when working at elevated levels.
7. What personal protective equipment (PPE) is required on most
construction sites?
A. Sunglasses
B. Hard hat, safety glasses, and steel-toed boots
C. Sneakers
D. Baseball cap
PPE protects workers from common construction hazards like falling
objects and debris.
8. When is it necessary to update a site safety plan?
A. Once a year
B. Only after accidents
C. Whenever site conditions or regulations change
D. Never
Safety plans must reflect current conditions and regulations to remain
effective.
9. Which of the following is a key factor in effective project
scheduling?
A. Ignoring subcontractors
B. Allocating sufficient time for each task and sequencing
appropriately
C. Focusing only on the last task
D. Limiting communication
Proper sequencing and realistic timing reduce delays and conflicts on
site.
Page 3 of 30 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides1 included
ofassessment
30 qualifying
for effective
preparation.Georgia
examination
assessment
Questions
preparation.
Construction
and Answers
Site Supervisor
+ Rationales
Exam Que
Georgia Construction Site Supervisor Exam
Questions And Correct Answers (Verified
Answers) Plus Rationales 2026 Q&A | Instant
Download Pdf
1. What is the primary responsibility of a construction site
supervisor?
A. Performing manual labor on site
B. Overseeing daily operations and ensuring safety compliance
C. Designing building plans
D. Selling construction materials
The construction site supervisor is responsible for managing site
operations and ensuring that all activities comply with safety
regulations.
2. Which of the following is the most effective method for preventing
on-site accidents?
A. Waiting for inspections
B. Implementing a comprehensive safety program
C. Using cheaper materials
D. Hiring more workers
Proactive safety programs reduce accidents by addressing hazards
before they result in injury.
3. When a worker is injured on-site, what is the supervisor’s first
action?
Page 1 of 30 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.
,. Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides2 included
ofassessment
30 qualifying
for effective
preparation.Georgia
examination
assessment
Questions
preparation.
Construction
and Answers
Site Supervisor
+ Rationales
Exam Que
A. Complete a performance review
B. Ensure the worker receives immediate medical attention
C. Continue work without interruption
D. Notify the media
Immediate medical attention is critical for worker safety and legal
compliance.
4. Which of the following documents must a site supervisor maintain
for OSHA compliance?
A. Financial records
B. Injury and illness logs
C. Personal emails
D. Marketing plans
OSHA requires documentation of workplace injuries and illnesses to
monitor safety and compliance.
5. What is the purpose of a pre-construction meeting?
A. To negotiate prices
B. To discuss project scope, safety, and responsibilities
C. To train workers on machinery
D. To organize recreational activities
Pre-construction meetings align all stakeholders on project expectations
and safety protocols.
6. Which type of hazard is associated with working at heights?
A. Chemical
B. Electrical
C. Fall
D. Ergonomic
Page 2 of 30 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.
, . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for Page
effective
guides3 included
ofassessment
30 qualifying
for effective
preparation.Georgia
examination
assessment
Questions
preparation.
Construction
and Answers
Site Supervisor
+ Rationales
Exam Que
Falls are the primary risk when working at elevated levels.
7. What personal protective equipment (PPE) is required on most
construction sites?
A. Sunglasses
B. Hard hat, safety glasses, and steel-toed boots
C. Sneakers
D. Baseball cap
PPE protects workers from common construction hazards like falling
objects and debris.
8. When is it necessary to update a site safety plan?
A. Once a year
B. Only after accidents
C. Whenever site conditions or regulations change
D. Never
Safety plans must reflect current conditions and regulations to remain
effective.
9. Which of the following is a key factor in effective project
scheduling?
A. Ignoring subcontractors
B. Allocating sufficient time for each task and sequencing
appropriately
C. Focusing only on the last task
D. Limiting communication
Proper sequencing and realistic timing reduce delays and conflicts on
site.
Page 3 of 30 . Complete exam prep,
. Complete
practiceexam
resources,
prep, and
practice
updated
resources,
study guides
and updated
included
study
for effective
guides included
assessment
for effective
preparation.
assessment preparation.