NORTH CAROLINA BUILDING CONTRACTOR EXAM QUESTIONS AND CORRECT ANSWERS (VERIFIED ANSWERS) PLUS RATIONALES 2026 Q&A

Content preview

NORTH CAROLINA BUILDING CONTRACTOR
EXAM QUESTIONS AND CORRECT
ANSWERS (VERIFIED ANSWERS) PLUS
RATIONALES 2026 Q&A


1. What is the primary purpose of the North Carolina Building Code?
| | | | | | | | | |




a) To increase property values
| | |



b) To set minimum construction standards
| | | |



c) To promote architectural design
| | |



d) To reduce construction costs
| | |



b) To set minimum construction standards
| | | |



The North Carolina Building Code establishes minimum requirements to
| | | | | | | |



safeguard public health, safety, and general welfare.
| | | | | | |




2. Which of the following requires a licensed general contractor in North
| | | | | | | | | |



Carolina?
|




a) A residential job valued at $15,000
| | | | |



b) A commercial job under $20,000
| | | |



c) A project costing over $30,000
| | | |



d) Any landscaping project
| |



c) A project costing over $30,000
| | | |

,North Carolina law mandates licensure for general contractors when the
| | | | | | | | |



total project value exceeds $30,000.
| | | | |




3. How long is a building permit valid in North Carolina if work is not
| | | | | | | | | | | | |



commenced? |




a) 30 days |



b) 90 days |



c) 6 months |



d) 12 months |



c) 6 months |



Permits become invalid if work does not commence within 6 months after
| | | | | | | | | | |



issuance.
|




4. What is the minimum footing depth for frost protection in North
| | | | | | | | | |



Carolina? |




a) 6 inches |



b) 12 inches |



c) 18 inches |



d) 24 inches |



d) 24 inches |



Footings must be a minimum of 12 inches below undisturbed ground and
| | | | | | | | | | |



12 inches below the frost line, totaling 24 inches in most NC areas.
| | | | | | | | | | | | |




5. Who is responsible for ensuring job site safety under OSHA
| | | | | | | | |



regulations? |




a) Project owner |



b) Architect
c) Contractor/employer
d) Inspector
c) Contractor/employer
|

,OSHA places responsibility on the employer (contractor) to provide a safe
| | | | | | | | | |



working environment.
| |




6. What is the allowable moisture content for wood framing at the time
| | | | | | | | | | |



of installation?
| |




a) 8%
b) 12%
c) 16%
d) 20%
c) 16%
|



Wood framing should not exceed 19% moisture content for dimensional
| | | | | | | | |



lumber; however, 16% is generally the standard to prevent issues.
| | | | | | | | | |




7. Which document details the contractor’s scope of work and
| | | | | | | |



responsibilities?
|




a) Insurance certificate |



b) Change order |



c) Contract
d) Building permit |



c) Contract
|



The contract outlines all obligations, expectations, and deliverables for
| | | | | | | |



both the contractor and client.
| | | | |




8. A load-bearing wall is typically identified in plans by:
| | | | | | | |




a) Color shading |



b) Wall thickness and location
| | |



c) Electrical symbols |



d) Flooring materials |



b) Wall thickness and location
| | | |



Load-bearing walls are often thicker and located strategically to support
| | | | | | | | |



structural loads.
| |

, 9. When is a contractor required to notify the NC Licensing Board for
| | | | | | | | | | |



General Contractors of a change in business address?
| | | | | | | |




a) Within 10 days | |



b) Within 30 days | |



c) Annually
d) Only at license renewal
| | |



b) Within 30 days | |



NCGC regulations require address changes be reported within 30 days to
| | | | | | | | | |



ensure up-to-date records.
| | |




10. Which type of construction is most fire-resistant?
| | | | | |




a) Type I |



b) Type II |



c) Type III |



d) Type V |



a) Type I |



Type I construction is non-combustible, using reinforced concrete and steel,
| | | | | | | | |



offering the highest fire resistance.
| | | | |




11. The term “draw schedule” refers to:
| | | | |




a) A list of materials
| | |



b) A project timeline
| |



c) A payment plan based on completed work
| | | | | |



d) A building inspection checklist
| | |



c) A payment plan based on completed work
| | | | | |



A draw schedule outlines when payments are made to the contractor
| | | | | | | | | |



based on work progress.
| | | |




12. Which insulation type has the highest R-value per inch?
| | | | | | | |

Document information

Uploaded on
January 8, 2026
Number of pages
31
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$19.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.1
(43)
Sold
277
Followers
6
Items
25888
Last sold
1 week ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions