BICSI INSTALLER 1 LATEST 2026 EXAM QUESTIONS AND
ANSWERS GRADED A+
✔✔Module 2: Professionalism & Project Planning
What are the 6 elements of professionalism? - ✔✔1. Credentials and Ability to work
2. Personal Image and Ethos
3. Interpersonal Skills
4. On-Site Activities
5. Remaining Current
6. Support Employers and Peers
✔✔Module 9: Space Preparation
A __________ in wide cable tray should be mounted on the same walls as the
backboard.
A. 24
B. 10
C. 6
D. 12 - ✔✔D. 12
✔✔Module 9: Space Preparation
A TE ( Telecommunications Enclosure ) should serve an area not greater
than__________ feet squared.
A. 46
B. 500
C. 335
D. 3600 - ✔✔D. 3600
✔✔Module 9: Space Preparation
,Allow no more than __________in of conduit and bushing to extend into the room.
A. 1
B. 2
C. 4
D. 3 - ✔✔D. 3
✔✔Module 9: Space Preparation
Clearance from the bottom of the access floor tile to the top of the cable tray or other
raceway shall be at least __________in to permit cable bundles and innerduct to exit
out the top of the tray without incurring damage.
A. 2
B. 3
C. 1
D. 4 - ✔✔A. 2
✔✔Module 9: Space Preparation
For a framed wall application, toggle bolts may be installed at __________in spacing
around the entire perimeter of the plywood board.
A. 24
B. 12
C. 6
D. 3 - ✔✔A. 24
✔✔Module 9: Space Preparation
For ICT systems a minimum of grade __________ should be used.
A. B/D
B. A/C
C. A/B
D. A/D - ✔✔A/C
✔✔Module 9: Space Preparation
,In the absence of a specified distance, plan for a minimum of approximately
__________m or ( 3.3' ) work and aisle space between and around equipment.
A. 2
B. 4
C. 1
D. 3 - ✔✔1
✔✔Module 9: Space Preparation
It is recommended that TRs ( telecommunications rooms ) have __________in thick,
fire-retardant plywood backboards installed on at least two walls of the TR (
telecommunications room ).
A. 1
B. 3/4
C. 1/2
D. 1 3/4 - ✔✔B. 3/4
✔✔Module 9: Space Preparation
Ladder rack should be installed on __________wall/s to maximize cable routing.
A. Every
B. 3
C. 1
D. 2 - ✔✔A. Every
✔✔Module 9: Space Preparation
Light, as measured within the TE ( telecommunications enclosure ), should be a
minimum of __________lux.
A. 50
B. 538
C. 460
, D. 46 - ✔✔B. 538
✔✔Module 9: Space Preparation
Plywood is available in __________ types.
A. 6
B. 2
C. 3
D. 4 - ✔✔B. 2
✔✔Module 9: Space Preparation
Plywood is available in __________ grades.
A. 3
B. 4
C. 1
D. 2 - ✔✔B. 4
✔✔Module 9: Space Preparation
Plywood sheets used for backboards should be installed __________ AFF.
A. 7"
B. 6"
C. 5"
D. 8" - ✔✔6"
✔✔Module 9: Space Preparation
Terminate conduits that protrude through the structural floor __________in above the
surface.
A. 1
ANSWERS GRADED A+
✔✔Module 2: Professionalism & Project Planning
What are the 6 elements of professionalism? - ✔✔1. Credentials and Ability to work
2. Personal Image and Ethos
3. Interpersonal Skills
4. On-Site Activities
5. Remaining Current
6. Support Employers and Peers
✔✔Module 9: Space Preparation
A __________ in wide cable tray should be mounted on the same walls as the
backboard.
A. 24
B. 10
C. 6
D. 12 - ✔✔D. 12
✔✔Module 9: Space Preparation
A TE ( Telecommunications Enclosure ) should serve an area not greater
than__________ feet squared.
A. 46
B. 500
C. 335
D. 3600 - ✔✔D. 3600
✔✔Module 9: Space Preparation
,Allow no more than __________in of conduit and bushing to extend into the room.
A. 1
B. 2
C. 4
D. 3 - ✔✔D. 3
✔✔Module 9: Space Preparation
Clearance from the bottom of the access floor tile to the top of the cable tray or other
raceway shall be at least __________in to permit cable bundles and innerduct to exit
out the top of the tray without incurring damage.
A. 2
B. 3
C. 1
D. 4 - ✔✔A. 2
✔✔Module 9: Space Preparation
For a framed wall application, toggle bolts may be installed at __________in spacing
around the entire perimeter of the plywood board.
A. 24
B. 12
C. 6
D. 3 - ✔✔A. 24
✔✔Module 9: Space Preparation
For ICT systems a minimum of grade __________ should be used.
A. B/D
B. A/C
C. A/B
D. A/D - ✔✔A/C
✔✔Module 9: Space Preparation
,In the absence of a specified distance, plan for a minimum of approximately
__________m or ( 3.3' ) work and aisle space between and around equipment.
A. 2
B. 4
C. 1
D. 3 - ✔✔1
✔✔Module 9: Space Preparation
It is recommended that TRs ( telecommunications rooms ) have __________in thick,
fire-retardant plywood backboards installed on at least two walls of the TR (
telecommunications room ).
A. 1
B. 3/4
C. 1/2
D. 1 3/4 - ✔✔B. 3/4
✔✔Module 9: Space Preparation
Ladder rack should be installed on __________wall/s to maximize cable routing.
A. Every
B. 3
C. 1
D. 2 - ✔✔A. Every
✔✔Module 9: Space Preparation
Light, as measured within the TE ( telecommunications enclosure ), should be a
minimum of __________lux.
A. 50
B. 538
C. 460
, D. 46 - ✔✔B. 538
✔✔Module 9: Space Preparation
Plywood is available in __________ types.
A. 6
B. 2
C. 3
D. 4 - ✔✔B. 2
✔✔Module 9: Space Preparation
Plywood is available in __________ grades.
A. 3
B. 4
C. 1
D. 2 - ✔✔B. 4
✔✔Module 9: Space Preparation
Plywood sheets used for backboards should be installed __________ AFF.
A. 7"
B. 6"
C. 5"
D. 8" - ✔✔6"
✔✔Module 9: Space Preparation
Terminate conduits that protrude through the structural floor __________in above the
surface.
A. 1