CONCRETE BATCH PLANT OPERATOR ACTUAL EXAM PAPER 2026 QUESTIONS WITH SOLUTIONS GUARANTEED TO PASS

Institution
CONCRETE BATCH PLANT OPERATOR
Course
CONCRETE BATCH PLANT OPERATOR









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CONCRETE BATCH PLANT OPERATOR
Course
CONCRETE BATCH PLANT OPERATOR

Document information

Uploaded on
January 8, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CONCRETE BATCH PLANT OPERATOR ACTUAL
EXAM PAPER 2026 QUESTIONS WITH
SOLUTIONS GUARANTEED TO PASS


◉Coarse aggregate stockpiles must be sprinkled for at lest how many
hours prior to batch for FDOT? Answer: 24


◉Free moisture of the aggregate means: Answer: Moister on the
surface of an aggregate that is above and beyond the absorbed moister in
the aggregate.


◉If the moister test is done other than by the cook-out method, how
often shall the other methods be verified? Answer: Each week


◉For drill shaft concrete, the quantity of cement replaced with fly ash
shall be: Answer: 33 thru 37%


◉In concrete, which material has a specific gravity of one? Answer:
Water


◉What is the air content range for all classes of structural concrete
except Class IV Shaft? Answer: 1.00 thru 6.00%

, ◉When can unmetered water be added to the concrete? Answer: Not at
all.


◉Do not allow the total number of revolution at mixing speed to exceed:
Answer: 160 Revolutions


◉After all materials have been charged into the transit mixer drum, the
concrete must be mixed at how many revolutions at the plant before
leaving for the project? Answer: 70 to 100


◉When the water meters / scales are calibrated, prior to production, at
what frequency should they be checked there after? Answer: 3 moths


◉To what accuracy should the scales for weighing cement , pozzolan,
slag and aggregates at the plant be maintained Answer: 0.5% of
maximum load normally handled


◉For concrete containing a water-reducing retarding admixture, in an
agitator truck, the maximum time for depositing the concrete shall not
exceed: Answer: 90 minutes


◉If a load of concrete has been rejected due to excessive slump, the
concrete may remain in the transporting vehicle to reduce the slump.
Answer: Is not allowed.
$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
ProfessorEddieJessup

Get to know the seller

Seller avatar
ProfessorEddieJessup Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
New on Stuvia
Member since
2 months
Number of followers
1
Documents
1560
Last sold
-

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions