CWB Level 1 Codes, Standards and ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
Specifications exam with correct answers ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
In Canada, who performs shop inspections of pressure vessels?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) An inspector certified to CSA W178.2.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) An inspector qualified by CSWIP in the jurisdiction of
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
employment.
C) An AWS certified QCI inspector in jurisdiction of employment.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
D) An inspector employed by the regulatory body in the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
province of fabrication. ||\\||\\ ||\\||\\
D) An inspector employed by the regulatory body in the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
province of fabrication. ||\\||\\ ||\\||\\
What is the first step in the preparation of a WPS?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) Qualify the welding personnel for use on the procedure.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) Calibrate the welding equipment used for establishing the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
WPS.
C) Select the variables to be used for welding.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
D) Inform the jurisdictional authority of your intensions.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
C) Select the variables to be used for welding.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
According to CSA B51, which code is designated for welding? ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) CSA Z662, Oil and Gas Pipeline Systems.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) AWS B2.1, Specification for Welding Procedure and
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
,Performance Qualification. ||\\||\\
C) ASME BPVC-IX.
||\\||\\ ||\\||\\
D) American Petroleum Institute (API) 650.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
C) ASME BPVC-IX.
||\\||\\ ||\\||\\
Which code of construction does CSA B52 work in conjunction
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
with?
A) ASME B31.1
||\\||\\ ||\\||\\
B) ASME B31.3
||\\||\\ ||\\||\\
C) ASME B31.5
||\\||\\ ||\\||\\
D) ASME B31.9
||\\||\\ ||\\||\\
C) ASME B31.5
||\\||\\ ||\\||\\
Where does ASME B31.1 Boiler External Piping terminate in
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
relation to the boiler? ||\\||\\ ||\\||\\ ||\\||\\
A) The first circumferential joint.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) The face of the first flange.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
C) The first threaded joint.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
D) All of the above.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) The face of the first flange.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
The standard that covers the general requirements for hollow
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
sections, sheet, cold formed channels and other structural ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
quality steel in Canada is: ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) ASTM A500
||\\||\\ ||\\||\\
, B) CCIIW ||\\||\\
C) CSA W117.1
||\\||\\ ||\\||\\
D) CSA G40.20/G40.21
||\\||\\ ||\\||\\
D) CSA G40.20/G40.21
||\\||\\ ||\\||\\
Which code stipulates the requirement of an operational control
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
procedure?
||\\||\\
A) CSA W47.1 ||\\||\\ ||\\||\\
B) CSA W47.2
||\\||\\ ||\\||\\
C) CSA W59 ||\\||\\ ||\\||\\
D) CSA W59.2 ||\\||\\ ||\\||\\
B) CSA W47.2
||\\||\\ ||\\||\\
Which company division requires a full-time engineer on staff?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) Division 1.
||\\||\\ ||\\||\\
B) Division 2.
||\\||\\ ||\\||\\
C) Division 3.
||\\||\\ ||\\||\\
D) All divisions.
||\\||\\ ||\\||\\
A) Division 1.
||\\||\\ ||\\||\\
The AWS D1.1 Structural Welding Code - Steel:
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) is identical in coverage to the CSA W47.1 standard.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) includes welding procedure and performance qualification
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
requirements.
Specifications exam with correct answers ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
In Canada, who performs shop inspections of pressure vessels?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) An inspector certified to CSA W178.2.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) An inspector qualified by CSWIP in the jurisdiction of
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
employment.
C) An AWS certified QCI inspector in jurisdiction of employment.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
D) An inspector employed by the regulatory body in the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
province of fabrication. ||\\||\\ ||\\||\\
D) An inspector employed by the regulatory body in the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
province of fabrication. ||\\||\\ ||\\||\\
What is the first step in the preparation of a WPS?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) Qualify the welding personnel for use on the procedure.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) Calibrate the welding equipment used for establishing the
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
WPS.
C) Select the variables to be used for welding.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
D) Inform the jurisdictional authority of your intensions.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
C) Select the variables to be used for welding.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
According to CSA B51, which code is designated for welding? ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) CSA Z662, Oil and Gas Pipeline Systems.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) AWS B2.1, Specification for Welding Procedure and
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
,Performance Qualification. ||\\||\\
C) ASME BPVC-IX.
||\\||\\ ||\\||\\
D) American Petroleum Institute (API) 650.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
C) ASME BPVC-IX.
||\\||\\ ||\\||\\
Which code of construction does CSA B52 work in conjunction
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
with?
A) ASME B31.1
||\\||\\ ||\\||\\
B) ASME B31.3
||\\||\\ ||\\||\\
C) ASME B31.5
||\\||\\ ||\\||\\
D) ASME B31.9
||\\||\\ ||\\||\\
C) ASME B31.5
||\\||\\ ||\\||\\
Where does ASME B31.1 Boiler External Piping terminate in
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
relation to the boiler? ||\\||\\ ||\\||\\ ||\\||\\
A) The first circumferential joint.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) The face of the first flange.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
C) The first threaded joint.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
D) All of the above.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) The face of the first flange.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
The standard that covers the general requirements for hollow
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
sections, sheet, cold formed channels and other structural ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
quality steel in Canada is: ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) ASTM A500
||\\||\\ ||\\||\\
, B) CCIIW ||\\||\\
C) CSA W117.1
||\\||\\ ||\\||\\
D) CSA G40.20/G40.21
||\\||\\ ||\\||\\
D) CSA G40.20/G40.21
||\\||\\ ||\\||\\
Which code stipulates the requirement of an operational control
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
procedure?
||\\||\\
A) CSA W47.1 ||\\||\\ ||\\||\\
B) CSA W47.2
||\\||\\ ||\\||\\
C) CSA W59 ||\\||\\ ||\\||\\
D) CSA W59.2 ||\\||\\ ||\\||\\
B) CSA W47.2
||\\||\\ ||\\||\\
Which company division requires a full-time engineer on staff?
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) Division 1.
||\\||\\ ||\\||\\
B) Division 2.
||\\||\\ ||\\||\\
C) Division 3.
||\\||\\ ||\\||\\
D) All divisions.
||\\||\\ ||\\||\\
A) Division 1.
||\\||\\ ||\\||\\
The AWS D1.1 Structural Welding Code - Steel:
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
A) is identical in coverage to the CSA W47.1 standard.
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
B) includes welding procedure and performance qualification
||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\ ||\\||\\
requirements.