Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

DC 3 rd CLASS TEST QUESTIONS AND CORRECT ANSWERS LATEST GUIDE 2026 GRADED A+ .

Rating
-
Sold
-
Pages
28
Grade
A+
Uploaded on
07-01-2026
Written in
2025/2026

1. The component in which liquid vapor by absorbing heat is called? CORRECT ANSWER evaporator 2. the best answer for an electrical grounding method? CORRECT ANSWER Metalstakedrive8footintothe ground. 3. A valve should be used for throttling purposes? CORRECT ANSWER Globe 4. What is the acceptable range for residual sodium sulfite in the boiler main- tain? CORRECT ANSWER 30-70 5. What is the BTU content of a gallon of #4 fuel oil? CORRECT ANSWER 146,000 6. What does a zeolite water softener system use as a means of regeneration?- CORRECT ANSWER brine 7. What are the 4 steps for a Zeolite Rejuvenation water softener process? CORRECT ANSWER Back- wash, Brine, Rinse, Service 8. Where medium temperature liquid found? CORRECT ANSWER Condenser 9. Where is high temperature vapor found? CORRECT ANSWER Atthedischargeofthecompressororcondenser 10. What stays are used to support the burner chamber in a scotch marine boiler? CORRECT ANSWER Diagonal Stays 11. What type of safety valve is this? CORRECT ANSWER ( Full) Crosby nozzle-type safety valve. Page 365 BOG 12. Where do you get superheat reading? CORRECT ANSWER Takesuctionlinepressure 13. Name the wire that connects all component of a system to a physical ground or water pipe? CORRECT ANSWER Grounding electrode conductor 14. Where do you getsub-cooling reading? CORRECT ANSWER Takeliquidlinepressure Cross reference to temperature using a P/T Chart Get liquid line temperature Subtract actual temperature from cross referenced temperature Result is Sub cooling 15. On the boilers that have both Quick opening and Screw type blow down valves, the Quick opening valve must be located? CORRECT ANSWER closesttotheboiler andfollowedbythe screw-type valve 16. High pressure boilers equipped with Quick opening and Screw type valves are blown down how? CORRECT ANSWER By opening the Quick opening valve first and closing it Last. 17. ASME Code defines a slow opening valve as what? CORRECT ANSWER Onerequiringatleast5full360degree turns between full open and close position. 3 / 28 18. A 300 Horsepower boiler operating at 100psi has an average load of 75% with 80% condensate return and 5% blow down. The treatment provides a chemical which costs $8.75 per gallon, and will treat 600 gallon. Find the amount of the chemical needed for the day period, and the cost of the chemical for a 30 days period? CORRECT ANSWER Water In = Water Out Makeup + Condensate Return = Evaporator + Blow Down Average Evaporator Rate = 300 x 34.5 pph x .75% load = 7762, 50 pph

Show more Read less

Content preview

rd
DC 3 CLASS TEST
QUESTIONS AND CORRECT
ANSWERS LATEST
GUIDE 2026
GRADED A+ .






,1. The component in which liquid vapor by absorbing heat is called?✔✔ CORRECT ANSWER evaporator

2. the best answer for an electrical grounding method?✔✔ CORRECT ANSWER Metal stake drive 8 foot into the ground.

3. A valve should be used for throttling purposes?✔✔ CORRECT ANSWER Globe

4. What is the acceptable range for residual sodium sulfite in the boiler main- tain?✔✔ CORRECT ANSWER
30-70

5. What is the BTU content of a gallon of #4 fuel oil?✔✔ CORRECT ANSWER 146,000

6. What does a zeolite water softener system use as a means of regeneration?-

✔✔ CORRECT ANSWER brine

7. What are the 4 steps for a Zeolite Rejuvenation water softener process?✔✔ CORRECT ANSWER Back- wash, Brine,
Rinse, Service

8. Where medium temperature liquid found?✔✔ CORRECT ANSWER Condenser

9. Where is high temperature vapor found?✔✔ CORRECT ANSWER At the discharge of the compressor or condenser

10. What stays are used to support the burner chamber in a scotch marine boiler?✔✔ CORRECT ANSWER
Diagonal Stays

11. What type of safety valve is this?✔✔ CORRECT ANSWER ( Full) Crosby nozzle-type safety valve. Page 365 BOG

12. Where do you get superheat reading?✔✔ CORRECT ANSWER Take suction line pressure

13. Name the wire that connects all component of a system to a physical ground or water pipe?✔✔ CORRECT ANSWER
Grounding electrode conductor

14. Where do you get sub-cooling reading?✔✔ CORRECT ANSWER Take liquid line pressure
Cross reference to temperature using a P/T Chart
Get liquid line temperature
Subtract actual temperature from cross referenced temperature Result is Sub cooling

15. On the boilers that have both Quick opening and Screw type blow down valves, the Quick opening valve must be
located?✔✔ CORRECT ANSWER closest to the boiler and followed by the screw-type valve

16. High pressure boilers equipped with Quick opening and Screw type valves are blown down how?✔✔ CORRECT
ANSWER By opening the Quick opening valve first and closing it Last.

17. ASME Code defines a slow opening valve as what?✔✔ CORRECT ANSWER Onerequiringatleast5full360degree turns between full
open and close position.



, 18. A 300 Horsepower boiler operating at 100psi has an average load of 75% with 80% condensate return and 5%
blow down. The treatment provides a chemical which costs $8.75 per gallon, and will treat 600 gallon. Find the
amount of the chemical needed for the day period, and the cost of the chemical for a 30 days period?✔✔ CORRECT
ANSWER Water In = Water Out
Makeup + Condensate Return = Evaporator + Blow Down


Average Evaporator Rate = 300 x 34.5 pph x .75% load = 7762, 50 pph


1 Month + .8( 7762.50 pph) = 7762.50 pph + 0500 m


1 Month + 6210 pph = 7762.50 pph + .0500 m
-6210 -6210
1 Month = 1552.5 pph + .0500


.9500 m = 1552.5 pph
.9500m .9500


1Month = 1,634.21 pph


Gallons per Month = 1634..33 x 24 x 30 = 141, 252.24 gallons per month
Chemical needed = 141,252.24 gallon / 600 gallon = 235, 40 gallon


Cost per month = 235, 40 gallon x 8.75 = $2,059.75

19. During a 24 hours operation how often should you check the water level?✔✔ CORRECT ANSWER once per shift

20. How often do you check the high limit switch?✔✔ CORRECT ANSWER Annually

21. What is the recommended time for a complete external inspection of a boiler?✔✔ CORRECT ANSWER
once per shift

22. What is the first thing to do when shutting down a boiler?✔✔ CORRECT ANSWER To turn ott the fire

23. A flow control should be blown down when?✔✔ CORRECT ANSWER once per shift

Document information

Uploaded on
January 7, 2026
Number of pages
28
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$13.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
onlinetutor2025 University of South Africa (Unisa)
View profile
Follow You need to be logged in order to follow users or courses
Sold
254
Member since
3 year
Number of followers
218
Documents
856
Last sold
6 days ago

3.8

18 reviews

5
8
4
4
3
3
2
1
1
2

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions