CSST Exam 2025 (Actual Exam) Questions
with verified Answers
Troweled-on boiler insulation, with 20% of its surface delaminated in a localized area, but
aa aa aa aa aa aa aa aa aa aa aa aa aa
with little or no potential for further damage, falls into which AHERA category? -
aa aa aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>Significantly Damaged Thermal Systems Insulation or Damaged Thermal Systems
aa aa aa aa aa aa aa aa aa
Insulation
aa
A room is 20' long, 30' wide, and 10' High. How many 1600 CFM negative pressure units,
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
operating at 75% efficiency, are required to achieve 4 air changes per hour? - ANS>>1
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
Under AHERA, all LEA's must have an Inspection completed by which date? -
aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>October 12, 1988
aa aa aa
Grade D air which is supplied from a compressed air source requires which of the
aa aa aa aa aa aa aa aa aa aa aa aa aa aa
following? - ANS>>A high-temperature and/or carbon monoxide alarm on the compressor
aa aa aa aa aa aa aa aa aa aa aa
Which of the following is the most serious condition? - ANS>>Heat Stroke
aa aa aa aa aa aa aa aa aa aa aa
A surfacing material with poor cohesion is a good candidate for _________ : -
aa aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>penetrating encapsulant
aa aa
After conducting air monitoring in a building for general asbestos hazard evaluation
aa aa aa aa aa aa aa aa aa aa aa
purposes, a building owner must Inform tenants of the results within 15 days. This is
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
required by: - ANS>>Connelly Bill, e.g. the Asbestos Notification Act
aa aa aa aa aa aa aa aa aa aa
, The AHERA regulation, 40 CFR 763, is a portion of which of the following? - ANS>>The
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
Toxic Substance Control Act (TSCA) Title 15
aa aa aa aa aa aa aa
A trench is being excavated in order to access and abate a transite water main. The
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
trench is 6' deep. Which of the following should be done? - ANS>>The trench should be
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
shored or use other collapses protective system and the trench may need to be treated
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
as a confined space, with required air testing performed
aa aa aa aa aa aa aa aa aa
Following an AHERA response action, which of the following does not require recording
aa aa aa aa aa aa aa aa aa aa aa aa
under AHERA? - ANS>>Fire rating data for encapsulant used.
aa aa aa aa aa aa aa aa aa
Following an employee's termination from an asbestos contractor employer, how long must
aa aa aa aa aa aa aa aa aa aa aa
training records be maintained? - ANS>>1 year
aa aa aa aa aa aa aa
Injury and Illness Prevention Plans are required by which agency? - ANS>>CAL/OSHA
aa aa aa aa aa aa aa aa aa aa aa
When does Cal/OSHA require notification for asbestos projects? - ANS>>Whenever any
aa aa aa aa aa aa aa aa aa aa
asbestos work will take place at a temporary job site (any amount)
aa aa aa aa aa aa aa aa aa aa aa aa
Which agency requires the unique Manifest ID number to be included on a bag of friable
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
asbestos waste? - ANS>>Cal/EPA's DTSC
aa aa aa aa aa
Ceiling tiles fall under which AHERA material classification? - ANS>>miscellaneous
aa aa aa aa aa aa aa aa aa
You are performing an AHERA survey; you identity a friable suspect asbestos sprayed
aa aa aa aa aa aa aa aa aa aa aa aa
acoustical material in 3 rooms on the ceiling. The room dimensions are 60 x 90', 12 x
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
90', and 60 x 60'. What is the minimum number of samples that you should collect? -
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>7
aa
with verified Answers
Troweled-on boiler insulation, with 20% of its surface delaminated in a localized area, but
aa aa aa aa aa aa aa aa aa aa aa aa aa
with little or no potential for further damage, falls into which AHERA category? -
aa aa aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>Significantly Damaged Thermal Systems Insulation or Damaged Thermal Systems
aa aa aa aa aa aa aa aa aa
Insulation
aa
A room is 20' long, 30' wide, and 10' High. How many 1600 CFM negative pressure units,
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
operating at 75% efficiency, are required to achieve 4 air changes per hour? - ANS>>1
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
Under AHERA, all LEA's must have an Inspection completed by which date? -
aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>October 12, 1988
aa aa aa
Grade D air which is supplied from a compressed air source requires which of the
aa aa aa aa aa aa aa aa aa aa aa aa aa aa
following? - ANS>>A high-temperature and/or carbon monoxide alarm on the compressor
aa aa aa aa aa aa aa aa aa aa aa
Which of the following is the most serious condition? - ANS>>Heat Stroke
aa aa aa aa aa aa aa aa aa aa aa
A surfacing material with poor cohesion is a good candidate for _________ : -
aa aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>penetrating encapsulant
aa aa
After conducting air monitoring in a building for general asbestos hazard evaluation
aa aa aa aa aa aa aa aa aa aa aa
purposes, a building owner must Inform tenants of the results within 15 days. This is
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
required by: - ANS>>Connelly Bill, e.g. the Asbestos Notification Act
aa aa aa aa aa aa aa aa aa aa
, The AHERA regulation, 40 CFR 763, is a portion of which of the following? - ANS>>The
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
Toxic Substance Control Act (TSCA) Title 15
aa aa aa aa aa aa aa
A trench is being excavated in order to access and abate a transite water main. The
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
trench is 6' deep. Which of the following should be done? - ANS>>The trench should be
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
shored or use other collapses protective system and the trench may need to be treated
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
as a confined space, with required air testing performed
aa aa aa aa aa aa aa aa aa
Following an AHERA response action, which of the following does not require recording
aa aa aa aa aa aa aa aa aa aa aa aa
under AHERA? - ANS>>Fire rating data for encapsulant used.
aa aa aa aa aa aa aa aa aa
Following an employee's termination from an asbestos contractor employer, how long must
aa aa aa aa aa aa aa aa aa aa aa
training records be maintained? - ANS>>1 year
aa aa aa aa aa aa aa
Injury and Illness Prevention Plans are required by which agency? - ANS>>CAL/OSHA
aa aa aa aa aa aa aa aa aa aa aa
When does Cal/OSHA require notification for asbestos projects? - ANS>>Whenever any
aa aa aa aa aa aa aa aa aa aa
asbestos work will take place at a temporary job site (any amount)
aa aa aa aa aa aa aa aa aa aa aa aa
Which agency requires the unique Manifest ID number to be included on a bag of friable
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
asbestos waste? - ANS>>Cal/EPA's DTSC
aa aa aa aa aa
Ceiling tiles fall under which AHERA material classification? - ANS>>miscellaneous
aa aa aa aa aa aa aa aa aa
You are performing an AHERA survey; you identity a friable suspect asbestos sprayed
aa aa aa aa aa aa aa aa aa aa aa aa
acoustical material in 3 rooms on the ceiling. The room dimensions are 60 x 90', 12 x
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
90', and 60 x 60'. What is the minimum number of samples that you should collect? -
aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa aa
ANS>>7
aa