Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 8 pages
Exam (elaborations)

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS AND SOLUTIONS RATED A+

Document preview thumbnail
Preview 2 out of 8 pages

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS AND SOLUTIONS RATED A+

Content preview

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS
AND SOLUTIONS RATED A+
✔✔Automatic line leak detectors shall be installed on underground pressurized piping
and be capable to detect a 3-gallon per hour leak rate at 10 psi within 1 hour, with a
probability of detection of at least ___? - ✔✔95%

✔✔Stage II Vapor Recovery Systems are the transfer of vapors from _________ to
_________. - ✔✔Vehicle Tank to UST

✔✔Who is ultimately responsible at a (GDF) Gasoline Dispensing Facility? - ✔✔Owner/
Operator

✔✔You are conducting a maintenance repair and you have a gasoline spill, you shall
take the following step as a safety precaution. - ✔✔Call 911-barricade spill area-clean
as much as you can and dispose of properly

✔✔Pressure Decay Test is tested in the of the UST - ✔✔Ullage

✔✔The Phil-tite riser float shall have __of clearance when installed - ✔✔13 inches

✔✔Upgrade requirements for UST's, spill and overfill prevention and underground
piping were required to be completed by what date? - ✔✔December 22, 1998

✔✔A balanced system shall contain a nozzle equipped with a ______ - ✔✔Bellows

✔✔On a Vacuum assist inverted coaxial hose, the vapors travel: - ✔✔In the inside
pathway of the hose

✔✔The tank riser drop tube is typically installed: - ✔✔Below the spill bucket

✔✔A ball float prevention system is designed and installed to: - ✔✔Alert the transfer
operator when the tank is 90% full by restricting flow

✔✔A UST will NOT require overfill prevention equipment if: - ✔✔Transfers are less than
25 gallons at a time

✔✔Suction piping operates at what pressure? - ✔✔Less that atmospheric pressure

✔✔close as practical to the suction pump, The maximum number of check valves
allowed for a system that operates at less than atmospheric pressure shall be _ . -
✔✔Below grade

, ✔✔Spill containers shall be a minimum capacity of _____ - ✔✔5 gallons

✔✔Design & Construction requirements for New Underground Storage Tanks and all
other components became effective. - ✔✔January 1 1995

✔✔Tank Integrity Test means: test methods which are capable of detecting a leak of __
gallons per hour with a probability of detection of at least 95%. - ✔✔0.1

✔✔Existing Underground Storage Tank means a UST installed prior to. - ✔✔January 1
1984

✔✔Where is a Vapor Shear valve located? - ✔✔Under the dispenser

✔✔Given that one valve shall remain open on a Healy Separator for normal operations,
the valve that shall remain open is . - ✔✔At the top

✔✔The emergency shut-off valve is located. - ✔✔Inside the kiosk

✔✔Vapor return piping shall have a uniform slope of at least ______. - ✔✔1/8" per foot

✔✔Typically vapor-return piping is connected to _____ - ✔✔The lowest grade gasoline

✔✔A liquid collection point is installed: - ✔✔In the vapor return piping

✔✔When installing vapor recovery piping in a trench, piping shall be excavation wall. -
✔✔6

✔✔The bedding for vapor recovery piping trench shall be ___inch of bedding material. -
✔✔6

✔✔Recommended underground piping backfill & compaction shall be __ in. maximum
size pea gravel. - ✔✔¾

✔✔place marking/metallic tape, place cooper wire with ends exposed, Before backfilling
underground piping, document the actual location of piping in as-built drawings as
follows: - ✔✔Take pictures

✔✔When making a transition from steel to nonmetallic piping: - ✔✔Loin female steel
threads to male non-metallic threads

✔✔Riser piping for fill side typically shall be of __ in. diameter schedule 40 steel piping.
- ✔✔4

Document information

Uploaded on
January 4, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK
3.5
(41)
Sold
283
Followers
10
Items
32850
Last sold
16 hours ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions