100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS AND SOLUTIONS RATED A+

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
04-01-2026
Written in
2025/2026

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS AND SOLUTIONS RATED A+

Institution
ICC VAPOR RECOVERY
Course
ICC VAPOR RECOVERY









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
ICC VAPOR RECOVERY
Course
ICC VAPOR RECOVERY

Document information

Uploaded on
January 4, 2026
Number of pages
8
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

ICC VAPOR RECOVERY 2 FINAL EXAM ACTUAL QUESTIONS
AND SOLUTIONS RATED A+
✔✔Automatic line leak detectors shall be installed on underground pressurized piping
and be capable to detect a 3-gallon per hour leak rate at 10 psi within 1 hour, with a
probability of detection of at least ___? - ✔✔95%

✔✔Stage II Vapor Recovery Systems are the transfer of vapors from _________ to
_________. - ✔✔Vehicle Tank to UST

✔✔Who is ultimately responsible at a (GDF) Gasoline Dispensing Facility? - ✔✔Owner/
Operator

✔✔You are conducting a maintenance repair and you have a gasoline spill, you shall
take the following step as a safety precaution. - ✔✔Call 911-barricade spill area-clean
as much as you can and dispose of properly

✔✔Pressure Decay Test is tested in the of the UST - ✔✔Ullage

✔✔The Phil-tite riser float shall have __of clearance when installed - ✔✔13 inches

✔✔Upgrade requirements for UST's, spill and overfill prevention and underground
piping were required to be completed by what date? - ✔✔December 22, 1998

✔✔A balanced system shall contain a nozzle equipped with a ______ - ✔✔Bellows

✔✔On a Vacuum assist inverted coaxial hose, the vapors travel: - ✔✔In the inside
pathway of the hose

✔✔The tank riser drop tube is typically installed: - ✔✔Below the spill bucket

✔✔A ball float prevention system is designed and installed to: - ✔✔Alert the transfer
operator when the tank is 90% full by restricting flow

✔✔A UST will NOT require overfill prevention equipment if: - ✔✔Transfers are less than
25 gallons at a time

✔✔Suction piping operates at what pressure? - ✔✔Less that atmospheric pressure

✔✔close as practical to the suction pump, The maximum number of check valves
allowed for a system that operates at less than atmospheric pressure shall be _ . -
✔✔Below grade

, ✔✔Spill containers shall be a minimum capacity of _____ - ✔✔5 gallons

✔✔Design & Construction requirements for New Underground Storage Tanks and all
other components became effective. - ✔✔January 1 1995

✔✔Tank Integrity Test means: test methods which are capable of detecting a leak of __
gallons per hour with a probability of detection of at least 95%. - ✔✔0.1

✔✔Existing Underground Storage Tank means a UST installed prior to. - ✔✔January 1
1984

✔✔Where is a Vapor Shear valve located? - ✔✔Under the dispenser

✔✔Given that one valve shall remain open on a Healy Separator for normal operations,
the valve that shall remain open is . - ✔✔At the top

✔✔The emergency shut-off valve is located. - ✔✔Inside the kiosk

✔✔Vapor return piping shall have a uniform slope of at least ______. - ✔✔1/8" per foot

✔✔Typically vapor-return piping is connected to _____ - ✔✔The lowest grade gasoline

✔✔A liquid collection point is installed: - ✔✔In the vapor return piping

✔✔When installing vapor recovery piping in a trench, piping shall be excavation wall. -
✔✔6

✔✔The bedding for vapor recovery piping trench shall be ___inch of bedding material. -
✔✔6

✔✔Recommended underground piping backfill & compaction shall be __ in. maximum
size pea gravel. - ✔✔¾

✔✔place marking/metallic tape, place cooper wire with ends exposed, Before backfilling
underground piping, document the actual location of piping in as-built drawings as
follows: - ✔✔Take pictures

✔✔When making a transition from steel to nonmetallic piping: - ✔✔Loin female steel
threads to male non-metallic threads

✔✔Riser piping for fill side typically shall be of __ in. diameter schedule 40 steel piping.
- ✔✔4

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BOARDWALK Havard School
View profile
Follow You need to be logged in order to follow users or courses
Sold
182
Member since
1 year
Number of followers
7
Documents
24136
Last sold
6 days ago
BOARDWALK ACADEMY

Ace Your Exams With Top Quality study Notes And Paper✅✅ ALL ACADEMIC MATERIALS AVAILABLE WITH US✅✅ LEAVE A REVIEW SO THAT WE CAN LOOK AND IMPROVE OUR MATERIALS.✅✅ WE ARE ALWAYS ONLINE AND AVAILABLE DONT HESITATE TO CONTACT US FOR SYUDY GUIDES!!✅✅ EVERYTHING IS GRADED A+✅✅ COLOUR YOUR GRADES WITH US , WE ARE HERE TO HELP YOU DONT BE RELACTANT TO REACH US

3.7

33 reviews

5
14
4
6
3
7
2
0
1
6

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions