What types of projects establish prevailing wage rates? Ans✓✓✓
Federally Funded Projects
Which of the following documents are submitted by the Contractor at
Bid opening? Ans✓✓✓ Proposal Form, Bid Breakdown, Addendum, Bid
Bond & Non-collusive Affidavit
Which document establishes the forms, content, and procedures for
submitting the bid proposals? Ans✓✓✓ Instruction to Bidders
Which of the following documents is normally incorporated by
reference? Ans✓✓✓ General Conditions
What is the name of the law principle for referring the Contractor to
other documents that are not contained in the package provided?
Ans✓✓✓ Incorporated by Reference
Which document establishes the labor rates on a project? Ans✓✓✓
Prevailing Wage Rate Schedule
Which document contains a description of the alternate(s)? Ans✓✓✓
General Requiremnts
,Which document specifies the existing soil conditions? Ans✓✓✓
Information Available to Bidders
Which document applies to the Contractor and the Subcontractors and
describes the administrative, procedural and temporary procedures on
the job site? Ans✓✓✓ General Requirements
Which document specifies the temporary facilities needed on a project?
Ans✓✓✓ General Requirements
Which document is submitted by each bidder stating that their bid was
arrived at without any conferring with other prime bidders? Ans✓✓✓
Non-Collusive Affidavit
Which document is submitted to the Owner for bid consideration before
the Contractor can receive the bidding documents? Ans✓✓✓ Pre-
qualification Forms
Which document describes the quality of work and the quality of the
materials and the construction execution procedures? Ans✓✓✓ Technical
Specifications
Which document describes the business procedures for a specific project
and they change the initial procedures? Ans✓✓✓ Supplementary
Conditions
,Which document specifies the Regulations required such as soil erosion
or minorities? Ans✓✓✓ General Requirements
Which document requests that additional information be submitted by
the bidder within 48 hours of bid opening? Ans✓✓✓ Proposal
Supplements
Which document issued by the Architect illustrates what is to be built?
Ans✓✓✓ Plans
Which document makes changes, modifications and corrections prior to
bid openings? Ans✓✓✓ Addenda
Which documents describe the duties and responsibilities of each party
and the business procedures for administering the contract? Ans✓✓✓
General Conditions
What is the term called which requires all Bidders to include in their bid
a specified amount or unit price for a particular item? Ans✓✓✓ Cash
Allowance
Which of the following systems is utilized for supporting an existing
structure when the new excavation will be below the existing structures
foundation while the extension to the existing foundation is being
placed? Ans✓✓✓ Underpinning
, What is the lifting system called which consists of two vertical towers
with a cross beam on top with the intended purpose of lifting an
unusually long piece of equipment which was transported horizontally
and it is lifted into its permanent vertical position? Ans✓✓✓ Jin Pole
What is the concrete pouring method called that is used to pour concrete
under water? Ans✓✓✓ Tremie
In construction, what is the proper terminology for transporting the off-
road equipment to the job site? Ans✓✓✓ Mobilization
Assume you are lifting an item onto the roof. The Height of the exterior
wall is 27 Feet above the ground and the horizontal distance from the
centerline of the rotation is 40 feet. What is the minimum length of the
boom required? Ans✓✓✓ 70 Feet
Which of the following temporary systems is utilized to support freshly
placed concrete which is poured on the ground as a slab and lifted up to
its final horizontal elevation using hydraulic jacks? Ans✓✓✓ Lift slab
form system
Which piece of equipment is most efficient for compacting granular
soils such as sand, gravel, and crushed stone? Ans✓✓✓ Smooth-Wheel
Roller