Safe Agile Advanced Scrum Master Exam
Questions and Answers Latest (2026)
(Verified Answers)
In complex systems development, what do local integration points ensure? - ANSWER-
That each Capability of the system is meeting its responsibilities in contributing to the
overall Solution Intent
Which statement is true about the phase-gate Milestone model? - ANSWER-It does not
mitigate risk as intended
How can learning Milestones be used? - ANSWER-To test the concept of a new
Feature or Capability
What are two reasons why too much work in process (WIP) is a problem? (Choose
two.) - ANSWER-It hides bottlenecks in the workflow;It shows that the overall system is
inefficient;
What is the connection between feedback and optimum batch size? - ANSWER-Lack of
feedback contributes to higher holding cost
What is the value of periodic resynchronization? - ANSWER-It limits variance to a single
time interval
, How should decentralized decision-making be used with respect to system design? -
ANSWER-When Agile Teams are empowered, self-organized, and the design is
allowed to emerge
During Iteration planning, the Product Owner (PO) introduces a new Story to the team.
They cannot come to a consensus on the size of the new Story and ask the PO for
more details. - ANSWER-No; the team left the Story in the Team Backlog for further
refinement with the PO
A team's Product Owner (PO) takes an unexpected leave of absence for the last week
of the Iteration. Three of the team's Stories have been completed and are waiting to be
accepted. - ANSWER-Work with the Release Train Engineer to find a solution
What is a recommended Story-splitting technique for Agile Teams? - ANSWER-
Implement the 'happy path' first and the rest of the scenarios afterwards
What is one characteristic of an effective Agile Team? - ANSWER-To provide steady,
high quality, incremental value
How does a Scrum Master lead a team's efforts in relentless improvement? - ANSWER-
By facilitating the Iteration Retrospective
Questions and Answers Latest (2026)
(Verified Answers)
In complex systems development, what do local integration points ensure? - ANSWER-
That each Capability of the system is meeting its responsibilities in contributing to the
overall Solution Intent
Which statement is true about the phase-gate Milestone model? - ANSWER-It does not
mitigate risk as intended
How can learning Milestones be used? - ANSWER-To test the concept of a new
Feature or Capability
What are two reasons why too much work in process (WIP) is a problem? (Choose
two.) - ANSWER-It hides bottlenecks in the workflow;It shows that the overall system is
inefficient;
What is the connection between feedback and optimum batch size? - ANSWER-Lack of
feedback contributes to higher holding cost
What is the value of periodic resynchronization? - ANSWER-It limits variance to a single
time interval
, How should decentralized decision-making be used with respect to system design? -
ANSWER-When Agile Teams are empowered, self-organized, and the design is
allowed to emerge
During Iteration planning, the Product Owner (PO) introduces a new Story to the team.
They cannot come to a consensus on the size of the new Story and ask the PO for
more details. - ANSWER-No; the team left the Story in the Team Backlog for further
refinement with the PO
A team's Product Owner (PO) takes an unexpected leave of absence for the last week
of the Iteration. Three of the team's Stories have been completed and are waiting to be
accepted. - ANSWER-Work with the Release Train Engineer to find a solution
What is a recommended Story-splitting technique for Agile Teams? - ANSWER-
Implement the 'happy path' first and the rest of the scenarios afterwards
What is one characteristic of an effective Agile Team? - ANSWER-To provide steady,
high quality, incremental value
How does a Scrum Master lead a team's efforts in relentless improvement? - ANSWER-
By facilitating the Iteration Retrospective