Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 37 pages
Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIAN GRADE I TEST PAPER 2026 COMPLETE QUESTIONS WITH CORRECT ANSWERS

Document preview thumbnail
Preview 4 out of 37 pages

ACI CONCRETE FIELD TESTING TECHNICIAN GRADE I TEST PAPER 2026 COMPLETE QUESTIONS WITH CORRECT ANSWERS

Content preview

ACI CONCRETE FIELD TESTING TECHNICIAN
GRADE I TEST PAPER 2026 COMPLETE
QUESTIONS WITH CORRECT ANSWERS


◉ ASTM Standard C138. Answer: Density (Unit Weight), Yield and Air
Content (Gravimetric) of Concrete


◉ ASTM Standard C173. Answer: Air Content of Freshly Mixed
Concrete by Volumetric Method


◉ ASTM Standard C231. Answer: Air Content of Freshly Mixed
Concrete by the Pressure Method


◉ ASTM Standard C143. Answer: Slump of Hydraulic-Cement
Concrete


◉ ASTM Standard C1064. Answer: Temperature of Freshly Mixed
Conrete


◉ ASTM Standard C31. Answer: Making and Curing Concrete Test
Specimens in the Field

,◉ [True or False]: The method of determining air content containing
lightweight aggregate is the pressure method. Answer: False (C231 &
C173)


◉ [True or False]: When making a test cylinder from concrete being
used in construction, the field technician must also measure the slump of
the concrete. Answer: True (C31)


◉ While the technician is checking the slump of the concrete, there is a
decided falling away or shearing off of concrete from one side of the
sample. What should the technician do?. Answer: Disregard the test and
retest on another portion of the sample


◉ Preparation of specimens for transport includes. Answer:
Determination that at least 8 hours has elapsed since final set


◉ If the aggregate correction factor for a given source of fine and coarse
aggregate is found to be 0.2% in a pressure air meter, and an air content
value of 5.0% is read on the gauge of the air meter testing that concrete,
what is the correct air content?. Answer: 4.8%


◉ Strength test specimens transported from the field to the testing
laboratory must be:. Answer: Protected from Jarring, moisture loss,
freezing

,◉ Test for slump and air content must be started within How Many
Minutes After Obtaining the Final Portion of the Composite Sample.
Answer: 5 minutes


◉ The minimum size for samples to be used for strength tests is:.
Answer: 1 Cubic Foot [28 Liters]


◉ [True of False]: After a Strike Off of the measure used to determine
density, a small quantity of concrete may be added to correct a
deficiency. Answer: False (C138)


◉ For normal strength concretes, what temperature range must be
maintained for test cylinders during initial curing?. Answer: 60 to 80 deg
F [16 - 27 C]


◉ [True or False]: When the concrete contains large aggregate, the
testing technician should wet-sieve the sample BEFORE making
Density (unit weight) tests for use in Yield Computations. Answer: False
(C172)


◉ What is the minimum amount of concrete cover in all directions
around the temperature sensor when measuring temperature?. Answer: 3
inches [75mm]

, ◉ [True or False]: The sides of the slump mold should be lightly tapped
to consolidate the concrete in the mold. Answer: False (C143)


◉ [True or False]: Unless specified otherwise, strength test specimens
molded from concrete having a slump less than 1 inch [25mm] must be
consolidated by vibration. Answer: True (C31)


◉ [True or False]: Test cylinders may be capped with a thin layer of
portland cement paste which is permitted to harden and cure with the
specimen. Answer: True (C31)


◉ Tamping rod should be (Multiple Choice). Answer: Flat, Tapered,
Pointed OR None of the above


◉ Start molding Strength Test specimens within How Many Minutes
after fabricating the composite sample. Answer: 15 minutes


◉ [True or False]: Representative samples are required for use in tests
conducted for the purpose of determining compliance with the
specifications for concrete quality. Answer: True (C172)


◉ [True or False]: Test method C173 specifies a minimum time
requirement for inverting and agitating the meter to free concrete from
the base. Answer: True - 45 seconds, no more than 5 seconds at a time

Document information

Uploaded on
December 23, 2025
Number of pages
37
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
FocusFile7
4.0
(25)
Sold
251
Followers
4
Items
64148
Last sold
14 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions