12/19/25, 2:25 PM NCCCO tower crane Exam Newest 2025 Complete Questions And Correct Detailed Answers (Verified Answers)|Already Graded A…
NCCCO tower crane Exam Newest 2025
Complete Questions And Correct Detailed
Answers (Verified Answers)|Already Graded A+
Save
Terms in this set (155)
Splices in rall tracks shall have Smooth Joints
Hydraulic systems should have their Daily
proper fluid level checked
If power fails during operations, the Do your best to finish moving load where it was
following shouldn't apply designated to go
If load is undetermined who is to find Person responsible for lift
out if load weight does not exceed
crane rating at radius at which the
load is to be lifted
Where should climbing instructions ON Site
be kept
All climbing operations shall be Qualified person
performed under the supervision of
https://quizlet.com/1124785651/nccco-tower-crane-exam-newest-2025-complete-questions-and-correct-detailed-answers-verified-answersalready-gr… 1/13
, 12/19/25, 2:25 PM NCCCO tower crane Exam Newest 2025 Complete Questions And Correct Detailed Answers (Verified Answers)|Already Graded A…
When cranes are erected, load Before crane is placed in service
limiting devices shall be tested for
proper setting and operation
Hooks shall be equipped with Impractical
latches unless the application makes
the use of the latch
Size and position of signs or panels Manufacturer
must satisfy the limitations of
Fall prevention measures are needed To a fall of 6ft or more
for working at locations where you
are exposed
Travel distance on hand levers shall than 14 inches from neutral position
not be greater
For power lines rated 175KV the 15ft
minimum clearance between the
lines and any part of the crane or
load is
All controls shall be tested by the start of new shift
operator at the
Before each climbing operation all Inspected
load members of the support system
shall be
Chain slings are required to be ID tagged
https://quizlet.com/1124785651/nccco-tower-crane-exam-newest-2025-complete-questions-and-correct-detailed-answers-verified-answersalready-gr… 2/13
NCCCO tower crane Exam Newest 2025
Complete Questions And Correct Detailed
Answers (Verified Answers)|Already Graded A+
Save
Terms in this set (155)
Splices in rall tracks shall have Smooth Joints
Hydraulic systems should have their Daily
proper fluid level checked
If power fails during operations, the Do your best to finish moving load where it was
following shouldn't apply designated to go
If load is undetermined who is to find Person responsible for lift
out if load weight does not exceed
crane rating at radius at which the
load is to be lifted
Where should climbing instructions ON Site
be kept
All climbing operations shall be Qualified person
performed under the supervision of
https://quizlet.com/1124785651/nccco-tower-crane-exam-newest-2025-complete-questions-and-correct-detailed-answers-verified-answersalready-gr… 1/13
, 12/19/25, 2:25 PM NCCCO tower crane Exam Newest 2025 Complete Questions And Correct Detailed Answers (Verified Answers)|Already Graded A…
When cranes are erected, load Before crane is placed in service
limiting devices shall be tested for
proper setting and operation
Hooks shall be equipped with Impractical
latches unless the application makes
the use of the latch
Size and position of signs or panels Manufacturer
must satisfy the limitations of
Fall prevention measures are needed To a fall of 6ft or more
for working at locations where you
are exposed
Travel distance on hand levers shall than 14 inches from neutral position
not be greater
For power lines rated 175KV the 15ft
minimum clearance between the
lines and any part of the crane or
load is
All controls shall be tested by the start of new shift
operator at the
Before each climbing operation all Inspected
load members of the support system
shall be
Chain slings are required to be ID tagged
https://quizlet.com/1124785651/nccco-tower-crane-exam-newest-2025-complete-questions-and-correct-detailed-answers-verified-answersalready-gr… 2/13