STUDY GUIDE 2026/2027 ACCURATE
QUESTIONS WITH CORRECT DETAILED ANSWER
|| 100% GUARANTEED PASS
<RECENT VERSION>
1. Roadway Worker Protection training - ANSWER ✔ Must be renewed
annually.
2. The cardinal rule of railroading is: - ANSWER ✔ Always expect a train or
equipment to move on any track in either direction at any time.
3. "Fouling" the track means being within __ feet of the field side of the
nearest rail. - ANSWER ✔ 4
4. According to the FRA, when working in the foul: - ANSWER ✔ A person
or equipment could be struck by a train or on-track equipment.
5. The following are roadway workers. - ANSWER ✔ Contractor employees
whose duties for a railroad client may require fouling a track.
6. Roadway workers are responsible to ascertain on track safety is provided: -
ANSWER ✔ Prior to fouling the track.
,7. A roadway worker shall not foul a track except : - ANSWER ✔ When
necessary for the performance of duty.
8. Roadway workers who perform work in the fouling space must do all of the
following except: - ANSWER ✔ Must be trained in the General Code of
Operating Rules
9. When using train approach warning method of on-track safety, roadway
workers must ensure they can clear the track and be in a predetermined place
of safety: - ANSWER ✔ At least 15 seconds prior to train arrival.
10.A Watchman/Lookout is required for this type of on-track safety. -
ANSWER ✔ Train approach warning
11.The following statement concerning working limits is NOT true. -
ANSWER ✔ On controlled track, working limits require physically
preventing trains or equipment from entering a work site (for example:
installing a derail, a discontinuity in the rail, or throwing a switch to isolate
disturbed track).
12.When are working limits required? - ANSWER ✔ Any time work may delay
or stop rail movements.
Any time workers or equipment can not immediately get clear.
Any time physical conditions compromise sightlines or the ability to get
clear.
ALL OF THE ABOVE.
, 13.Which category of on-track safety methods must be used if a project
involves equipment working in the foul? - ANSWER ✔ Working limits on
controlled and non-controlled track.
14.Foul Time - ANSWER ✔ A method of establishing working limits on a
main track, secondary track or siding on which a roadway worker is notified
by the Train Dispatcher through the Block Operator that no trains will
operate within the working limits established on that track until the roadway
worker reports clear of the track
15.Inaccessible Track - ANSWER ✔ A method of establishing working limits
on tracks not controlled by the Train Dispatcher or Block Operator by
physically preventing the entry and movement of trains
16.Job Briefing - ANSWER ✔ When reporting for duty, employees whose
duties require coordination with other employees must hold a job briefing to
review operational and safety conditions. If these conditions change,
employees must hold an additional job briefing to discuss the new conditions
17.Roadway Worker - ANSWER ✔ An employee of a railroad, or of a
contractor to a railroad, whose duties include inspection, construction,
maintenance or repair of railroad track, bridges, roadway, signal and
communication systems, electric traction systems, roadway facilities or
roadway maintenance machinery on or near track or with the potential of
fouling a track and flagmen and watchmen/lookouts responsible for their
protection
18.Watchman/Lookout - ANSWER ✔ A properly equipped employee that has
been annually trained on roadway worker protection whose sole duty is to