1. The primary responsibility of a construction manager is to:
A. Design the structure
B. Supervise individual trades
C. Coordinate the planning and execution of a project
D. Perform quality testing
Rationale: Construction managers oversee scheduling, cost,
quality, safety, and coordination of the entire project.
2. Which project delivery method places the greatest risk on the
owner?
A. Design-build
B. Construction management at risk (CMAR)
C. Integrated project delivery
D. Design-bid-build
Rationale: In design-bid-build, the owner holds separate
contracts and bears greater coordination and change risk.
3. A critical path in scheduling represents:
A. All project activities
B. Optional activities
C. Activities with float
, D. The longest sequence of dependent activities
Rationale: The critical path determines the minimum project
duration and has zero float.
4. Which document defines the relationship between the owner and
construction manager?
A. Shop drawings
B. Contract agreement
C. Submittals
D. As-built drawings
Rationale: The contract agreement establishes rights,
obligations, and scope of services.
5. What is the primary purpose of a work breakdown structure
(WBS)?
A. Identify safety hazards
B. Determine labor rates
C. Divide the project into manageable components
D. Track weather delays
Rationale: WBS helps organize and structure project scope for
better control.
6. Cost control is primarily concerned with:
A. Increasing profit
B. Monitoring and managing project expenses
C. Reducing labor productivity
D. Extending project duration
Rationale: Cost control ensures spending stays within the
approved budget.
, 7. Which contract type provides the greatest cost certainty for the
owner?
A. Cost-plus contract
B. Time and materials contract
C. Lump sum contract
D. Unit price contract
Rationale: Lump sum contracts fix the total price, reducing
owner cost risk.
8. Float in a schedule refers to:
A. Material delivery time
B. The amount of time an activity can be delayed without
impacting the project
C. Worker efficiency
D. Weather conditions
Rationale: Float measures schedule flexibility.
9. A scope creep problem results from:
A. Too much supervision
B. Uncontrolled changes to project scope
C. Excessive documentation
D. Early project completion
Rationale: Scope creep occurs when changes are made without
proper approval or control.
10. The main purpose of a preconstruction conference is to:
A. Approve final payment
B. Solve disputes
C. Establish communication and coordination procedures
D. Hire workers
Practice Question And Correct Answers
(Verified Answers) Plus Rationales 2026
Q&A Instant Download Pdf
1. The primary responsibility of a construction manager is to:
A. Design the structure
B. Supervise individual trades
C. Coordinate the planning and execution of a project
D. Perform quality testing
Rationale: Construction managers oversee scheduling, cost,
quality, safety, and coordination of the entire project.
2. Which project delivery method places the greatest risk on the
owner?
A. Design-build
B. Construction management at risk (CMAR)
C. Integrated project delivery
D. Design-bid-build
Rationale: In design-bid-build, the owner holds separate
contracts and bears greater coordination and change risk.
3. A critical path in scheduling represents:
A. All project activities
B. Optional activities
C. Activities with float
, D. The longest sequence of dependent activities
Rationale: The critical path determines the minimum project
duration and has zero float.
4. Which document defines the relationship between the owner and
construction manager?
A. Shop drawings
B. Contract agreement
C. Submittals
D. As-built drawings
Rationale: The contract agreement establishes rights,
obligations, and scope of services.
5. What is the primary purpose of a work breakdown structure
(WBS)?
A. Identify safety hazards
B. Determine labor rates
C. Divide the project into manageable components
D. Track weather delays
Rationale: WBS helps organize and structure project scope for
better control.
6. Cost control is primarily concerned with:
A. Increasing profit
B. Monitoring and managing project expenses
C. Reducing labor productivity
D. Extending project duration
Rationale: Cost control ensures spending stays within the
approved budget.
, 7. Which contract type provides the greatest cost certainty for the
owner?
A. Cost-plus contract
B. Time and materials contract
C. Lump sum contract
D. Unit price contract
Rationale: Lump sum contracts fix the total price, reducing
owner cost risk.
8. Float in a schedule refers to:
A. Material delivery time
B. The amount of time an activity can be delayed without
impacting the project
C. Worker efficiency
D. Weather conditions
Rationale: Float measures schedule flexibility.
9. A scope creep problem results from:
A. Too much supervision
B. Uncontrolled changes to project scope
C. Excessive documentation
D. Early project completion
Rationale: Scope creep occurs when changes are made without
proper approval or control.
10. The main purpose of a preconstruction conference is to:
A. Approve final payment
B. Solve disputes
C. Establish communication and coordination procedures
D. Hire workers