Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

CM 3111 exam Questions and Answers | New 2025/2026 Update | With Complete Solutions

Document preview thumbnail
Preview 2 out of 12 pages

CM 3111 exam Questions and Answers | New 2025/2026 Update | With Complete Solutions

Content preview

CM 3111 exam Questions and Answers | New
2025/2026 Update | With Complete Solutions
The _____ consist(s) of the invitation to bid, instructions to bidders, bid form, owner-

contractor agreement, general conditions of the contract, supplementary general

conditions, technical specifications, and the working drawings and form(s) the legal basis

for the construction of the project.

contract documents

The _____ includes determination of the quantities and costs of everything required to

complete the project. This includes the materials, labor, equipment, insurance, bonds, and

overhead, as well as an estimate of profit.

detailed estimate

_____ involves the contractor working with the owner (or through the owner's architect-

engineer) to arrive at a mutually acceptable price for the construction of the project. It

often involves negotiations back and forth on materials used, sizes, finishes, and other items

which affect the price of the project.

Negotiated bidding

What additional skill must the estimator have to be able to take a quantity survey and turn

it into a detailed estimate?

a. Must be able to use computer hardware and software and know how to manipulate the

various databases available or how to build databases.

b. Must have sufficient knowledge or labor performance and operations so that he can

convert them into costs on a project.

, c. Must be able, from looking at drawings, to visualize the project through the various

phases of construction.

d. All of the above

d. All of the above

_____ estimates are prepared by multiplying the square footage of a building by a cost per

square foot and then adjusting the price to compensate for differences in the building

heights, length of the building perimeter, and other building components. These estimates

require less information to prepare and are less accurate.

Square-foot

The _____ are written instructions concerning project requirements that describe the

quality of materials to be used and their performance.

technical specifications

The _____ are the actual plans from which the project will be constructed. They contain

the dimensions and locations of building elements, the materials required, and delineate

how they fit together.

working drawings

A percentage of the payments from the owner to the contractor that is withheld for the

protection of the owner and suppliers:

Retainage

What is a type of insurance that a contractor should maintain?

a. Builder's Risk insurance

Document information

Uploaded on
December 6, 2025
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUINTER
3.6
(73)
Sold
413
Followers
105
Items
40085
Last sold
5 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions