100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

COSC 475 – Construction Project Management | Exam 2 Q&A (100+ Questions) – Resource Leveling, Productivity, S-Curves

Rating
-
Sold
-
Pages
11
Grade
A+
Uploaded on
05-12-2025
Written in
2025/2026

This document provides over 100 in-depth and professionally verified questions and answers from Exam 2 of the COSC 475 2025/2026 course on Construction Project Management. The material focuses on advanced scheduling strategies, resource management, and productivity optimization across multiple concurrent construction projects. Topics include resource allocation, resource leveling, manpower-loaded schedules, workspace constraints, and coordination of subcontractor labor across sites. It also explains learning curve theory, installation rate calculations, S-curve modeling, peak manpower estimation, and productivity degradation due to punch lists or extended timelines. Practical case-based scenarios help illustrate decision-making around shared equipment, project phasing, just-in-time delivery, and efficiency trade-offs. Concepts like progressive demobilization, schedule variance, and forecast accuracy are supported by visual models and examples referenced from real-world studies. Ideal for students of construction science, project management, and civil engineering, this resource also supports professionals preparing for PMP certification or advancing their expertise in large-scale project planning and control. Keywords: cosc 475, construction project management, resource leveling, manpower schedules, S-curve, 2/3 bell curve, productivity planning, learning curve, peak manpower, installation rate, schedule variance, progressive demobilization, just-in-time delivery, workspace planning, resource allocation, project efficiency, schedule forecasting, punch list impact, construction productivity

Show more Read less
Institution
Cosc
Course
Cosc









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Cosc
Course
Cosc

Document information

Uploaded on
December 5, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

COSC 475 Exam 2 Study Questions
2025/2026 Exam All Answers and
Illustrations Given



You are a southern California contractor. You have been awarded two

projects: one in downtown Los Angeles and one near the Mojave

reservation. Each project needs a safety manager at essentially the same

time, each for a duration of about 6 weeks. Would you share resources

between these two projects when both projects have a flexible end date?

The client on each project has stated that a safety manager will be on-site

each day for at least half the days work duration when crews are on-site. -

🧠 ANSWER ✔✔No

, Utilizing just in time material delivery for materials being delivered to the

work site: what would be your sites overarching, more than any other main

restriction that would drive you to this decision? - 🧠 ANSWER ✔✔No or

very little available on site laydown space

Utilizing extreme theories like the inventory buffer theory, is it economical to

have all materials on-site before starting a project to achieve the lowest

cost option project (Cost driven, not schedule driven)? One clue, when

referencing just all material being on-site before construction starts, is that I

would refer to this as "The Dream Project" - 🧠 ANSWER ✔✔Uneconomical


When dealing with work space and the ever changing nature of the work

during the life cycle of a project, which of the following is not considered a

work space consideration for planning and resource leveling? - 🧠 ANSWER

✔✔All the above should be considered


The assignment of resources required to complete a given activity, or work

item, in the required amount and timing is known as what? - 🧠 ANSWER

✔✔Resource allocation


If you are running a company and you have a limited number of labor

resources but multiple different projects, would distance between the two

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NinjaNerd Liberty University
View profile
Follow You need to be logged in order to follow users or courses
Sold
195
Member since
1 year
Number of followers
4
Documents
12070
Last sold
5 hours ago
NinjaNerd

Here You will All Documents and Package Deals Offered by Seller NinjaNerd.

3.8

30 reviews

5
14
4
5
3
6
2
2
1
3

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions