The Virginia erosion and stormwater management plan (VESMP) is authorized by the
___ - Answer✅✅Virginia erosion and stormwater management act (VESMA)
The Virginia erosion and stormwater management plan (VESMP) is administered
through ______ - Answer✅✅Virginia erosion and stormwater management (VESM)
The General VPDES permit for discharges of stormwater from construction activities
is also known as ___ - Answer✅✅The construction general permit (CGP)
VESMA requires the state water control board to ___ - Answer✅✅permit, regulate,
and control soil erosion and stormwater runoff and act to protect the quality and
quantity of state waters
What two parts of the SWPPP must be approved by the VESMP? - Answer✅✅The
ESC plan and the SWM plan
, What must the SWPPP adress? - Answer✅✅site specific potential sources of
pollution that may be generated during and after construction, and be updated
through construction
what does the ESC plan adress? - Answer✅✅any structural and non structural
practices to be used during construction to keep sediment in place, and capture any
sediment that is moved by stormwater before it leaves the site
what does the SWM plan adress? - Answer✅✅methods used for controlling post
construction stormwater discharges
what does the P2 plan adress? - Answer✅✅general good housekeeping practices to
reduce discharge of pollutants
what is the VESM water quality site based load limit for phosphorus? -
Answer✅✅0.26 lbs/acre/year for new development
what are phosphorus load calculations based on? - Answer✅✅land cover types and
soils
when must P-BMPS be added to the plan? - Answer✅✅when the site does not
initially meet the water quality criteria
what does the VESM water quantity technical criteria adress? - Answer✅✅channel
protection and flood protection
post development, the peak discharge in a watershed can be ____ than pre
development - Answer✅✅2 - 5 times higher
what is a LDA - Answer✅✅A man made change to land cover that may result in soil
erosion or has the potential to change its runoff characteristic
LDA's of the following size must comply with VESMA regualtions - Answer✅✅- one
acre or more
- activities that are part of a larger common plan of development or sale that is one
acre or more
- 2,500 sq ft or more in the CBPA
- any activity that disturbs 10,000 sq ft or more and less than one acre are subject to
soil erosion requirements and water quality technical criteria
- a more stringent area as established in local ordinance
municipalities that operate a separate storm sewer system (MS4) _____ -
Answer✅✅must adopt and administer a VESMP
what is the first step after a noted violation has not been fixed? - Answer✅✅notice
to comply