BCN 3740 Legal Final Study Guide Set
Exam Questions and Answers Graded A+

The Betterment Defense in a contract action would - Correct answer-Be alleged by

the contractor and claim that the owner is seeking completion costs from the work

performed by the replacement contractor which work exceeded the quality, scope

and/or amount originally contracted for by the owner with the original contractor

Work on a public project pursuant to Florida Statue 255.05, requires a bond be

posted by - Correct answer-the contractor if the contract work is in excess of

$200,000

The total Cost Method of Damages calculates damages by - Correct answer-taking

the total cost of the work loss the original bid amount by the contractor to come up

with a damages number

Once a complaint has been served upon - Correct answer-File a response to the

complaint within 20 days of being served

The amount of the bond on a public project must equal - Correct answer-The

contract price between the owner and contractor


©COPYRIGHT 2025, ALL RIGHTS RESERVED 1

, The preferred method of litigation for a contractor is through - Correct answer-it

depends on the circumstances

If your contract has an enforceable arbitration clause the parties to that contract

must arbitrate unless - Correct answer-Both parties to the contract act inconsistent

with the arbitration clause in their contract

Categories of extras to a construction contract for which a contractor may claim

additional monies may include - Correct answer-Improper site conditions/ work

changes as a result of code requirements

A contractor working on a government project - Correct answer-None of the above

A general contractor who reviews plans and specifications for a construction

project has a duty to tell the owner and/or architect and/or engineer about defects

in the plans and specifications only if those defects - Correct answer-Patent Defects

A cardinal change to a contract is - Correct answer--a change so significant that it

changes the entire scope of the contract

-a change so significant that the contract is abandoned and the measure of damages

is the reasonable value of the work performed

The most widely accepted method of calculating unabsorbed home office overhead

is by using - Correct answer-The Eichleay Formula


©COPYRIGHT 2025, ALL RIGHTS RESERVED 2

Document information

Uploaded on
December 1, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.09

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
960
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions