The location of the First Responder Box should be coordinated with _________. -
ANSWERSFDNY
All fire extinguishers must be inspected annually by _____________ - ANSWERSFDNY
Certified Company with a valid C of F.
The standard acetylene cylinder capacity is__________ - ANSWERS420 SCF
For a powder actuated tool, a permit is required to store, handle, use or sell ________ -
ANSWERS200 or more shells of small arms ammunition (E21)
By opening up the system, the CSFSM will test the standpipe alarm _______ -
ANSWERSOnce a week
Discharged fire extinguishers must be removed____________ - ANSWERSImmediately
When a portable space heater is being used on a construction site, fire extinguishers
shall be provided not more than ______ feet in distance. - ANSWERS30
When does the FDNY consider an oxygen/acetylene set up to be in storage? -
ANSWERSWhen the regulator is removed and it is capped
A fireguard for a torch operation must maintain the following... - ANSWERSDaily log
book
SCF stands for_________. - ANSWERSstandard cubic feet
Fire extinguisher signage must be a minimum of___________ - ANSWERS10" X 7"
During a CDA inspection, CDA inspector asks more "NO SMOKING" signs to be posted
on the 43rd floor. All managers onsite (PE/CM/PM/SUPER) disagree with the inspector
recommendation. What will be the best decision for the CSFSM to do? -
ANSWERSNotify all parties responsible for the project to comply and document in the
CSFSM log
What is needed to use a powder actuated tool on a construction site in NYC? -
ANSWERSA certificate of fitness is required to both operate the tool and handle the
ammunition. (E21)