F60 Fireguard test Exam Questions and Answers 100% Correct
For hot work operation with citywide permit, the owner of the premises of the hot work operation areas must be notified in writing by the citywide permit holder ______ the hot work is to be started. - ANSWER-at least 48 hours before The pre-hot work check must be conducted by the responsible person before hot work is authorized and __________ - ANSWER-least once per day. The check reports must be kept at the work site during the work, made available for inspection by a representative of the FDNY, and maintained on the premises for a minimum of - ANSWER-48 hours after work is complete. A pre-hot work check must be conducted at least - ANSWER-once per day Hot work operations involving cutting or welding shall be conducted at least - ANSWER-35 feet from combustible materials and combustible waste All other hot work operations shall be conducted at least - ANSWER-25 feet from combustible materials and combustible waste Sprinkler system protection ____________while hot work is performed. - ANSWER-must not be shut off or impaired When should a Fire watch be maintained - ANSWER-A fire watch must be maintained during any hot work operation. What other duties should the Fire Watch have while on hot water operations. - ANSWER-The persons conducting a fire watch shall not have other duties. Where hose lines are required, they shall be connected, charged and ready for operation - ANSWER-At least one portable fire extinguisher with a minimum 2-A:20-B:C How far away should one fire extinguisher be from any operation - ANSWER-30 feet The fire watch for torch operations conducted at the following three locations shall be conducted by at least one F-60 fire guard - ANSWER-(1)Construction sites. (2)In any building or structure, when the torch operation is conducted by a person holding a citywide permit for torch operations. (3)On any rooftop, or in connection with any torch-applied roofing system operation
Escuela, estudio y materia
- Institución
- F60 Fireguard
- Grado
- F60 Fireguard
Información del documento
- Subido en
- 31 de marzo de 2024
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
f60 fireguard test exam questions and answers 100
-
f60 fireguard test exam questions stuvia
-
the pre hot work check must be conducted by the re
Documento también disponible en un lote