100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CWEA Collection Systems Maintenance Practice Questions for CWEA Grade 1 and 2 Tests Questions with correct Answers (A+ GRADED 100% VERIFIED)| 2025/2026

Rating
-
Sold
1
Pages
10
Grade
A+
Uploaded on
27-11-2025
Written in
2025/2026

CWEA Collection Systems Maintenance Practice Questions for CWEA Grade 1 and 2 Tests Questions with correct Answers (A+ GRADED 100% VERIFIED)| 2025/2026

Institution
CWEA Collection Systems Maintenance
Course
CWEA Collection Systems Maintenance









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CWEA Collection Systems Maintenance
Course
CWEA Collection Systems Maintenance

Document information

Uploaded on
November 27, 2025
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CWEA Collection Systems Maintenance
Practice Questions for CWEA Grade 1
and 2 Tests
1.​ "High priority subsurface installations are high pressure natural gas
pipelines with normal operating pressures greater than 415 kPa gauge,
petroleum pipelines, conductors or cables that are potentially hazardous
to employees, or the public, if damaged." This paragraph indicates that
before the start date of an excavation, what should occur?
○​ Answer: An agreed upon site visit
2.​ 550 gallons of sewage overflow and do not reach any surface waters.
What category of overflow is this?
○​ Answer: Category 3
3.​ A flow of 650 gpm would be how many mgd?
○​ Answer: 0.936
4.​ A hazard that may damage a TV camera going through a sewer is:
○​ Answer: An offset joint
5.​ A person who completes a training program in accordance with the
requirements of Title 8, Calif. Code of Regulations, Minimum Guidelines
of the Common Ground Alliance is considered a ______________ person
○​ Answer: Qualified Person
6.​ According to the State Water Resources Control Board Order No.
2006-003-DWQ, each enrollee must develop and implement a
system-specific:
○​ Answer: SSMP (Sewer System Management Plan)
7.​ After completing a Temporary Traffic Control setup for your work zone it
is a good practice to:
○​ Answer: Observe how effective your TTC setup is working to control
traffic and make the necessary changes
8.​ Based on new Best Practices of the Common Ground Alliance for
marking underground Utilities, the Inquiry Identification Number for an
Underground Service Alert (USA) is viable for how many days?
○​ Answer: 28 days
9.​ Before starting a maintenance operation in a basement located in the
backyard of a residence you should:
○​ Answer: Contact the resident and politely ask permission to enter their
backyard
10.​Biological activity in long, sluggish-flow, flat grade sewer lines will likely
cause:
○​ Answer: Odors

, 11.​Clear water entering a collection system is called what?
○​ Answer: Infiltration
12.​Emergency stoppages in pipelines may be cleared safely by use of:
○​ Answer: High velocity cleaners
13.​Flatter sewer line grades may cause added sewer maintenance expense
and odor nuisance. This is caused by what?
○​ Answer: A decrease in velocity which allows organic and inorganic
solids to settle out. This, in turn, allows biological activity to happen
which corrodes the pipe and releases hydrogen sulfide (H2S) which
smells like rotten eggs
14.​For a nighttime Short Term Stationary Traffic Control Zone setup on low
speed/low volume street, the minimum height of the traffic cones used
shall be ________
○​ Answer: 28 inches
15.​How can the members of a balling crew communicate with each other?
○​ Answer: Hand Signals
16.​How high do your traffic cones need to be if the speed limit around your
work zone is 35 MPH?
○​ Answer: 18". Cone height must be 18" if speed limit is 30 MPH or less
and 28" if the speed limit is 45 MPH or more
17.​How long do you have to report a category 1 SSO?
○​ Answer: 2 hours
18.​How long do you have to report a category 2 or 3 SSO?
○​ Answer: 3 days
19.​How many flaggers are REQUIRED to perform a basic flagging
operation?
○​ Answer: One
20.​How many types of common shoring are there?
○​ Answer: 6
21.​How often must an excavation site and adjacent areas be inspected for
hazardous conditions?
○​ Answer: Daily
22.​In developing an S.O.P. for air monitoring in a Permit Required Confined
Space you would include what two factors?
○​ Answer: Placement of the blower and a weather forecast
23.​Infiltration can occur in a pipe when the pipe is:
○​ Answer: Cracked, broken, fractured, has roots coming into it, etc.
24.​Maintenance programs are based on:
○​ Answer: Preventative and corrective maintenance principles
25.​Name and describe the three soil types
○​ Answer: Type A: cohesive soils like clay; Type B: Cohesive soil that
have been disturbed or angular gravel; Type C: Granular Soils like
sand. These are the least stable
$11.99
Get access to the full document:

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
gradepapers465
3.0
(1)

Get to know the seller

Seller avatar
gradepapers465 Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
5
Member since
4 months
Number of followers
0
Documents
773
Last sold
1 week ago

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can immediately select a different document that better matches what you need.

Pay how you prefer, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card or EFT and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions