Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

CEPSCI Practice Exam| Brand New Exam Questions with 100% Correct Clear Verified Answers| All Graded A+|Latest Premium Update|100% Guaranteed Success.

Rating
1.0
(1)
Sold
2
Pages
11
Grade
A+
Uploaded on
26-11-2025
Written in
2025/2026

CEPSCI Practice Exam| Brand New Exam Questions with 100% Correct Clear Verified Answers| All Graded A+|Latest Premium Update|100% Guaranteed Success. 1972 clean water act - AnswerAdministered by the US environmental protection agency (EPA) Created the NPDES 1987 - AnswerAmendment to CWA CALLED WATER QUALITY ACT NPDES in south carolina - AnswerSouth Carolina is NPDES delegated state. NPDES regulations are administered by - AnswerSCDHEC CGP authorizes - Answerstormwater discharges from construction sites Who must obtain NPDES coverage - Answerland disturbing activities greater than or equal to 1 acre -land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone NPDES permits are issued to - Answeroperator-person or company for a particular discharge primary permittee - Answer-has day to day operational control to ensure compliance with SWPP -typically the owner or developer primary permittee responsibilites - Answersubmit NOI, Preparation of the C_SWPPP Secondary permittee - Answerindividual lot owner or residential builder that conducts land disturbing activity limited to an individual lot or group of lots as part of approved LCP of development contractors - Answermust on Contractor Certification- D-0437 On-Site SWPPP - AnswerSCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local Approvals, USACE approvals, Critical area permit(coast) OS_SWPPP - Answera copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC must be retained at site or electronically accessible minor modification to ON-SWPPP - Answerminor modifications made directly in the field,do not need approval by DHEC- additional BMP's, removal of disturbed areas major modifications to OS-SWPPP - Answermust be made by qualified individual and submitted to DHEC or appropriate delegated entity for approval Phased plan requirement 5 - Answerinclude a phased stormwater management plan which identifies all BMP's and grading work conducted during a specific portion of the sites construction sequence. Each phase identified on at least one separate plan sheet. Phased plan requirement 10 but 5 acres - Answerat least two separate plan phases are required - initial land disturbance phase - stabilization phase Phased plan requirement ≥ 10 acres - Answerat least 3 separate plan phases are required - initial land disturbance phase - construction phase - stabilization phase All compliance inspection must include invesg. of, at a minimum of 5 of the following - Answer1. areas of site disturbed by construction activity and areas used for storage of materials exposed to precipitation 2. stormwater conveyance systems for evidence of sediment 3. BMP's identified in OS-SWPPP 4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible, nearby downstream location if possible. 5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

Show more Read less
Institution
CEPSCI
Course
CEPSCI

Content preview

CEPSCI Practice Exam| Brand New
Exam Questions with 100% Correct
Clear Verified Answers| All Graded
A+|Latest Premium Update|100%
Guaranteed Success.




1972 clean water act - Answer✅✅Administered by the US environmental protection
agency (EPA) Created the NPDES

1987 - Answer✅✅Amendment to CWA CALLED WATER QUALITY ACT

NPDES in south carolina - Answer✅✅South Carolina is NPDES delegated state.

NPDES regulations are administered by - Answer✅✅SCDHEC

CGP authorizes - Answer✅✅stormwater discharges from construction sites

Who must obtain NPDES coverage - Answer✅✅land disturbing activities greater
than or equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone

NPDES permits are issued to - Answer✅✅operator-person or company for a
particular discharge

, primary permittee - Answer✅✅-has day to day operational control to ensure
compliance with SWPP
-typically the owner or developer

primary permittee responsibilites - Answer✅✅submit NOI, Preparation of the
C_SWPPP

Secondary permittee - Answer✅✅individual lot owner or residential builder that
conducts land disturbing activity limited to an individual lot or group of lots as part of
approved LCP of development

contractors - Answer✅✅must on Contractor Certification- D-0437

On-Site SWPPP - Answer✅✅SCDHEC CGP, NOI, NPDES coverage approval letter,
Contractor Certifications, Local Approvals, USACE approvals, Critical area
permit(coast)

OS_SWPPP - Answer✅✅a copy of signed and certified SWPPP, NOI, and CGP
coverage letter from DHEC must be retained at site or electronically accessible

minor modification to ON-SWPPP - Answer✅✅minor modifications made directly
in the field,do not need approval by DHEC- additional BMP's, removal of disturbed
areas

major modifications to OS-SWPPP - Answer✅✅must be made by qualified
individual and submitted to DHEC or appropriate delegated entity for approval

Phased plan requirement > 5 - Answer✅✅include a phased stormwater
management plan which identifies all BMP's and grading work conducted during a
specific portion of the sites construction sequence. Each phase identified on at least
one separate plan sheet.

Phased plan requirement < 10 but > 5 acres - Answer✅✅at least two separate plan
phases are required - initial land disturbance phase - stabilization phase

Phased plan requirement ≥ 10 acres - Answer✅✅at least 3 separate plan phases
are required - initial land disturbance phase - construction phase - stabilization phase

All compliance inspection must include invesg. of, at a minimum of 5 of the
following - Answer✅✅1. areas of site disturbed by construction activity and areas
used for storage of materials exposed to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are
inaccessible, nearby downstream location if possible.
5. Where vehicles enter or exit site for evidence of off-site sediment tracking.

Written for

Institution
CEPSCI
Course
CEPSCI

Document information

Uploaded on
November 26, 2025
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Reviews from verified buyers

Showing all reviews
1 month ago

Not enough question to review for study

1.0

1 reviews

5
0
4
0
3
0
2
0
1
1
Trustworthy reviews on Stuvia

All reviews are made by real Stuvia users after verified purchases.

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRILLIANTSOLUTIONS St Johns River State College Orange Park
View profile
Follow You need to be logged in order to follow users or courses
Sold
69
Member since
2 year
Number of followers
2
Documents
2697
Last sold
3 weeks ago
A+SCIENCE SOLUTIONS HUB

GET THE LATEST EXPERTLY SOLVED REVISION,ACTUAL EXAMS,FINAL ,MID-TERM EXAMS AND RETAKES EXAM MATERIALS IN ALL SCIENCE COURSES AT AN AFFORDABLE PRICE.

2.9

8 reviews

5
2
4
1
3
1
2
2
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions