1|Page
CET-415 Construction Project Management Final Exam Questions with
100% VERIFIED Answers UPDATED!!!
There are two skills sets that must be developed by project
managers. Name them - ANSWER process skills and people
skills
What is RFP? - ANSWER Request for Proposal
Several certifications are available to project managers. Name
two. - ANSWER 1. PMP--Project Management Professional
2.PgMP--Program Management Professional
Name three process functions for project managers. - ANSWER
1. Planning projects
2. Scheduling Projects
3. Handling risk
In Scenario 2.1, what was Danny's problem? - ANSWER Danny
doesn't have good people skills and has difficulty
communicating with others.
,2|Page
What is a mission statement? - ANSWER contains the name of
the project, a brief description of the project, and the purpose
of the construction team
Name the four aspects of building an effective team. - ANSWER
Assess, Plan, Execute, and Evaluate
Name the five strategies to resolve conflict. - ANSWER 1. Clarify
assignments
2. Clarify roles
3. Encourage to talk through their differences
4. Encourage to disagree without being disagreeable
5. Handle conflict promptly
When a problem arises within a team, there are three basic
human responses to a problem. Name all three - ANSWER 1.
escape
2. attack
3. resolution
, 3|Page
In Scenario 9.2 what was Melinda's problem? - ANSWER She
doesn't know how to handle diversity and resolve conflict
The two most common types of estimates are: - ANSWER Unit
cost/assemblies and square foot
What is a screening or rough order of magnitude estimate? -
ANSWER used to determine the feasibility of a project
There are 2 basic commonly used models in preparing an
estimate. For an assembly estimate, this model is called: -
ANSWER CSI 50-Division Masterformat
The estimating model used for square foot estimates is -
ANSWER UNIFORMAT II-12 Division
What is the difference between the two estimating models? -
ANSWER In CSI each item is included individually and in
UNIFORMAT, they are allocated to one of seven major group
elements.
CET-415 Construction Project Management Final Exam Questions with
100% VERIFIED Answers UPDATED!!!
There are two skills sets that must be developed by project
managers. Name them - ANSWER process skills and people
skills
What is RFP? - ANSWER Request for Proposal
Several certifications are available to project managers. Name
two. - ANSWER 1. PMP--Project Management Professional
2.PgMP--Program Management Professional
Name three process functions for project managers. - ANSWER
1. Planning projects
2. Scheduling Projects
3. Handling risk
In Scenario 2.1, what was Danny's problem? - ANSWER Danny
doesn't have good people skills and has difficulty
communicating with others.
,2|Page
What is a mission statement? - ANSWER contains the name of
the project, a brief description of the project, and the purpose
of the construction team
Name the four aspects of building an effective team. - ANSWER
Assess, Plan, Execute, and Evaluate
Name the five strategies to resolve conflict. - ANSWER 1. Clarify
assignments
2. Clarify roles
3. Encourage to talk through their differences
4. Encourage to disagree without being disagreeable
5. Handle conflict promptly
When a problem arises within a team, there are three basic
human responses to a problem. Name all three - ANSWER 1.
escape
2. attack
3. resolution
, 3|Page
In Scenario 9.2 what was Melinda's problem? - ANSWER She
doesn't know how to handle diversity and resolve conflict
The two most common types of estimates are: - ANSWER Unit
cost/assemblies and square foot
What is a screening or rough order of magnitude estimate? -
ANSWER used to determine the feasibility of a project
There are 2 basic commonly used models in preparing an
estimate. For an assembly estimate, this model is called: -
ANSWER CSI 50-Division Masterformat
The estimating model used for square foot estimates is -
ANSWER UNIFORMAT II-12 Division
What is the difference between the two estimating models? -
ANSWER In CSI each item is included individually and in
UNIFORMAT, they are allocated to one of seven major group
elements.