Content preview

VA DEQ ESC INSPECTOR EXAM
QUESTIONS AND CORRECT ANSWERS.
VERIFIED 2025/2026.




VESCP - ANS Virginia Erosion and Sediment Control Program


- Administered by counties/cities (must), towns (may)
- MUST BE APPROVED


Minimum Standard 1 - ANS Stabilization


permanent or temporary soil stabilization shall be applied to denuded areas within seven days
after final grade is reached on any portion of the site; temporary soil stabilization shall be
applied within seven days to denuded areas that may not be at final grade but will remain
dormant for longer than 14 days; permanent stabilization shall be applied to areas that are to
be left dormant for more than one year


Site NOT at Final Grade - ANS - stabilize in 14 days
- temporarily seed
- mulch
- permanently stabilize if dormant > 1 year


Site at Final Grade - ANS - stabilize in 7 days (recommended immediately)
- permanently or temporarily seed and mulch

1 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

,- mulch/matting/straw


Minimum Standard 2 - ANS Stock Piles, Waste and Borrow Areas


during construction, soil stock piles and borrow areas shall be stabilized or protected with
sediment trapping measures


mulch prevents erosion by protecting the surface from raindrop impact and silt fence intercepts
and detains from disturbed areas


Minimum Standard 3 - ANS Permanent Vegetation


permanent vegetation cover shall be established on denuded areas not otherwise permanently
stabilized (permanent vegetation shall not be considered established until a ground cover is
achieved that is uniform, mature enough to survive, and will inhibit erosion *there is no %
associated with this*)


reduce erosion and decrease sediment yield from disturbed area


this is the standard used to verify that a site is ready for release of bonds or surety


Minimum Standard 4 - ANS First-Step Measures


Sediment basins and traps, perimeter dikes, sediment barriers and other measures intended to
trap sediment shall be constructed as a first step in any land-disturbing activity and shall be
made functional before upslope land disturbance takes place


a certain amount of initial land disturbance may be required to provide access for equipment to
install the perimeter controls, but site clearing and grading should be kept to a minimum until
the perimeter controls are in place




2 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

, intercepts and detains small amounts of sediment from disturbed areas during construction
operation to prevent sediment from leaving the site and decrease velocity of sheet flows and
low-to-moderate level channel flow


Perimeter Controls - ANS assures that sediment does not leave the perimeter of the land-
disturbing area once site clearing, grading, and construction commences


Examples: silt fences, sediment traps, sediment basins, construction entrance, temporary
diversions, diversions


Minimum Standard 5 - ANS Earthen Structure Stabilization


stabilization measures shall be applied to earthen structures such as dams, dikes, and diversions
immediately after installation


reduce erosion and sedimentation and reduce damage from sediment and runoff to
downstream or off-site areas


Minimum Standard 6 - ANS Traps and Basins


sediment traps and basins shall be designed and constructed based upon the total drainage
area (not just disturbed area) to be served by the trap or basin


Sediment Traps - ANS minimum storage capacity shall be 134 cubic yards per acre of drainage
area and shall only control drainage areas less than 3 acres


*stone outlet = trap*


Sediment Basins - ANS surface runoff from disturbed areas that is comprised of flow from
drainage areas greater than or equal to 3 acres shall be controlled by a basin; minimum storage
capacity of a sediment basin shall be 134 cubic yards per acre of drainage area; the outfall
system shall, at a minimum, maintain the structural integrity of the basin during a 25-year storm

3 @COPYRIGHT 2025/2026 ALLRIGHTS RESERVED.

Document information

Uploaded on
November 20, 2025
Number of pages
30
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainbarter
3.6
(58)
Sold
367
Followers
159
Items
22996
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions