1
Jump Master Questions with Answers (100%
Correct Answers)
What is baseline currency Answer: Two safeties and one assistant jumpmaster
Novice rated jumpmasters must perform what duties every 180 days to remain
current Answer: An assistant jumpmaster (AJ) or primary jumpmaster (PJ)
What are the three areas of jumpmaster duties Answer: The unit area,
departure airfield, and inflight
When do the duties of the jumpmaster team begin Answer: Immediately upon
notification
The primary jumpmaster may delegate authority but not what Answer:
Responsibility
What are the duties of the jumpmaster team in the unit area Answer:
Operations brief/S-3 air brief, jumpmaster rehearsals, sustained airborne
training, and mock door training
What is the minimum height of the PLF platform Answer: 24 inches
At a minimum, Sustained Airborne Training must include what Answer:
Parachute landing falls, mock door training, prejump
Sustain Airborne Training can be conducted how many hours before takeoff
Answer: 48 hours
How many mock door rehearsals must be conducted during mock door training
Answer: Minimum of two mock door rehearsals must be conducted with the
last rehearsal being conducted as planned for the airborne operation
The safeties will draw ____ aviators kit bags for every ___ jumpers. The safeties
will draw ___ universal parachutist recovery bags for every ___ jumpers
Answer: 1 AKB per 15 jumpers, 1 UPRB per 30 jumpers
, 2
How many additional T-11 reserve parachutes and tuck tab inserts will be
drawn for an airborne operation Answer: 2 T-11 reserve parachutes and two
sets of tuck tab inserts
The primary jumpmaster should oversee the jumpmaster personnel inspection
and help inspect jumpers in order to make _________ _____________. Answer:
Station time
Does the jumpmaster working the correction station need to be current?
Answer: No, just qualified
Can a jumpmaster who is not current JMPI Answer: No
What does SERJT/E stand for Answer: Static line control, exiting procedures,
red light procedures, jump refusals, towed jumper procedures, emergency
procedures
How long before drop time does the C-130 begin its slow down Answer: 3
minutes
How long before drop time does the C-17 Globemaster begin its slowdown
Answer: 6 minutes
What is the description of the T-11 main parachute Answer: Troop back static
line deployed non maneuverable parachute
What is the approximate rate of descent of the T-11 main parachute Answer:
18.5 feet per second
What is the maximum suspended weight of the T-11 main parachute Answer:
400 pounds
Average deployment time for the T-11 main parachute Answer: 6.5 seconds
Minimum safe drop speed for the T-11 main parachute Answer: 50 knots
Maximum safe drop speed for the T-11 main parachute Answer: 150 knots
Jump Master Questions with Answers (100%
Correct Answers)
What is baseline currency Answer: Two safeties and one assistant jumpmaster
Novice rated jumpmasters must perform what duties every 180 days to remain
current Answer: An assistant jumpmaster (AJ) or primary jumpmaster (PJ)
What are the three areas of jumpmaster duties Answer: The unit area,
departure airfield, and inflight
When do the duties of the jumpmaster team begin Answer: Immediately upon
notification
The primary jumpmaster may delegate authority but not what Answer:
Responsibility
What are the duties of the jumpmaster team in the unit area Answer:
Operations brief/S-3 air brief, jumpmaster rehearsals, sustained airborne
training, and mock door training
What is the minimum height of the PLF platform Answer: 24 inches
At a minimum, Sustained Airborne Training must include what Answer:
Parachute landing falls, mock door training, prejump
Sustain Airborne Training can be conducted how many hours before takeoff
Answer: 48 hours
How many mock door rehearsals must be conducted during mock door training
Answer: Minimum of two mock door rehearsals must be conducted with the
last rehearsal being conducted as planned for the airborne operation
The safeties will draw ____ aviators kit bags for every ___ jumpers. The safeties
will draw ___ universal parachutist recovery bags for every ___ jumpers
Answer: 1 AKB per 15 jumpers, 1 UPRB per 30 jumpers
, 2
How many additional T-11 reserve parachutes and tuck tab inserts will be
drawn for an airborne operation Answer: 2 T-11 reserve parachutes and two
sets of tuck tab inserts
The primary jumpmaster should oversee the jumpmaster personnel inspection
and help inspect jumpers in order to make _________ _____________. Answer:
Station time
Does the jumpmaster working the correction station need to be current?
Answer: No, just qualified
Can a jumpmaster who is not current JMPI Answer: No
What does SERJT/E stand for Answer: Static line control, exiting procedures,
red light procedures, jump refusals, towed jumper procedures, emergency
procedures
How long before drop time does the C-130 begin its slow down Answer: 3
minutes
How long before drop time does the C-17 Globemaster begin its slowdown
Answer: 6 minutes
What is the description of the T-11 main parachute Answer: Troop back static
line deployed non maneuverable parachute
What is the approximate rate of descent of the T-11 main parachute Answer:
18.5 feet per second
What is the maximum suspended weight of the T-11 main parachute Answer:
400 pounds
Average deployment time for the T-11 main parachute Answer: 6.5 seconds
Minimum safe drop speed for the T-11 main parachute Answer: 50 knots
Maximum safe drop speed for the T-11 main parachute Answer: 150 knots