100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

2025/ 2026 Boiler License A Test Study Guide Sample Questions High-Pressure Certification Exam Latest Updated with Solution

Rating
-
Sold
-
Pages
61
Grade
A+
Uploaded on
19-11-2025
Written in
2025/2026

Access the 2025/ 2026 Boiler License A Test study guide with solution, including high-pressure boiler sample questions and detailed answers. This comprehensive exam prep resource covers boiler operation, safety procedures, maintenance, troubleshooting, combustion systems, and code compliance. Designed to help candidates strengthen technical knowledge, improve accuracy, and confidently pass the Boiler License A Test with solution.

Show more Read less
Institution
Boiler Inspector Licensing
Module
Boiler Inspector Licensing











Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Boiler Inspector Licensing
Module
Boiler Inspector Licensing

Document information

Uploaded on
November 19, 2025
Number of pages
61
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

In a boiler room there is an HRT boiler with the following dimensions: the
drum is 96 inches in diameter and 36 ft long; there are a total of 90 tubes,
4 inches in diameter,; and the boiler shell is bricked 1/3 of the distance
from above.


What is the total heating surface of the tube sheets, in square feet?



Select one:
a. 84.78 FIND OUT WHY



a. 84.78 Correct


b. 101.87


c. 74.80


d. 95.31

, When performing an inspection of the internal structure inside the steam
and water drum during annual maintenance on a water tube boiler, what
are the necessary precautions?



Select one:

d. open the firesides and remove the
burners
a. lock and tag the safety valve


b. follow confined space entry procedures


c. open the bottom blowdown lines to prevent backflow


d. open the firesides and remove the burners

, Why is it necessary to keep a water seal on the atmospheric relief valve?



Select one:



a. to prevent air from entering the
a. to prevent air from entering the condenser
condenser

b. stop steam from blowing out of the turbine


c. prevent particulates from entering the turbine


d. stop steam from entering the turbine

What is the quantity of heat needed to raise 40 pounds of air from 60
degrees F to 550 degrees F?



Select one:
Q=MC(T2-T1)
Q=MC air(T2-T1)
Q=40.24550-40
a. 2,326 Btu
Q=40.24490
Q=4704 BTU
b. 5,415 Btu


c. 4,704


d. 504 Btu

, Which of the following is not a type of coal?



Select one:



d. carbonite a. lignite


b. anthracite


c. sub-bituminous


d. carbonite

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NotesPro 5th Dimension College of Visual Arts
View profile
Follow You need to be logged in order to follow users or courses
Sold
12174
Member since
1 year
Number of followers
10
Documents
901
Last sold
1 week ago

4.8

23 reviews

5
22
4
0
3
0
2
0
1
1

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their exams and reviewed by others who've used these revision notes.

Didn't get what you expected? Choose another document

No problem! You can straightaway pick a different document that better suits what you're after.

Pay as you like, start learning straight away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and smashed it. It really can be that simple.”

Alisha Student

Frequently asked questions