100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

CISEC Exam Questions & Answers | 100% Verified solutions |Questions with Correct Answers 2025 latest update!!

Rating
-
Sold
-
Pages
13
Grade
A
Uploaded on
16-11-2025
Written in
2025/2026

CISEC Exam Questions & Answers | 100% Verified solutions |Questions with Correct Answers 2025 latest update!!

Institution
CISEC
Course
CISEC









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
CISEC
Course
CISEC

Document information

Uploaded on
November 16, 2025
Number of pages
13
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Content preview

CISEC Exam Questions & Answers | 100% Verified
solutions |Questions with Correct Answers 2025
latest update!!

Save




Terms in this set (62)


Land Developing Projects - altering landscape for
LDP
projects such as agriculture or housing ect.

National Pollutant Discharge Elimination System


NPDES - section of the CWA (Clean Water Act) to permit
stormwater discharges associated w industrial
activities PER permit

Adminstrative
CWA Penalty Types Class I. Neglegent
Class II. Knowlingly = greater fines

- SWPPP
- CGP
What documents are - Site Map
required on site? - Drawings and Key
- All inspection reports
- Any amendments to SWPPP

Usually the OWNER of the site, not the contractor,
Who is the "operator"?
unless authorized by the owner to general contractor
Also the LRP.
to have day-to-day operational control!

, Required from start to end of project. "End" being the
final vegetative/non-vegetative (concrete)
When do you need permit
stabilization occuring.
coverage?

For any project one acre or greater.

-strips off all existing vegetation a.k.a site carving
-usually on hillsides and steep slopes
Large Land Development
-installation of untilities that tear up large areas of
land

- Homebuilding, smaller residence construction
projects
Vertical Projects
-usually multiple subcontractors
-requires lots of housekeeping = mass choas

-commercial buildings
Bix Box Projects -mass grading and mass choas
-highly visible w/ fairly large footprint

-roadways, utilities, and stream corridors
-long narrow sites and mass choas
Linear Projects
-limites site access and continually changing (high
activity)

The process by which soil particle get displaced by
What is erosion?
the act of wind of water.

1. Creep - causes sand dunes
<10%
-large particle that roll across a terrain


2. Saltation - bouncing particles that DISLODGE more
What are the three types particles, then fall back down
of Wind Erosion? ~50-80%
- stay relatively close to ground


3. Suspesion - suspended way up into the atmosphere
~ 5-25%
-light weight soil particles dusted in the air
Free
Get access to the full document:
Download

100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached

Get to know the seller
Seller avatar
Milestone

Also available in package deal

Thumbnail
Package deal
PACKAGE DEAL FOR EXAMS
-
500 2025
$ 26.73 More info

Get to know the seller

Seller avatar
Milestone Teachme2-tutor
View profile
Follow You need to be logged in order to follow users or courses
Sold
257
Member since
11 months
Number of followers
0
Documents
1502
Last sold
13 hours ago

0.0

0 reviews

5
0
4
0
3
0
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions